CITB ยท Health, safety and environment test for operatives

High risk activities

88 questions in this part of the Health and Safety Test (CSCS) bank. Every answer below is the one the bank holds, and the document under each question is where it was written from. They are written from those documents; they are not the questions of the real test, which are not published.

Practise the whole bank in the browserThe same bank as an Android app, on Google Play

All 88 questions

  1. 1. High risk activitiescscs-100

    How should any roof be treated until you know otherwise?

    • AAs fragileAnswer
    • BAs safe if it carries a person
    • CAs safe if it is less than ten years old
    • DAs safe if it is made of metal

    Only someone competent can confirm a roof is not fragile, and until they do you stay off it. Do not trust a sheeted roof of any material to hold your weight, including the ridge and the purlins. Rooflights are the worst because paint or poor light hides them.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/roofwork.htm

  2. 2. High risk activitiescscs-101

    What share of fatal falls from height in construction happen through fragile surfaces?

    • A22%Answer
    • B2%
    • C50%
    • D75%

    Fibre cement roofs and rooflights account for most of them. People doing small, short maintenance and cleaning jobs are over represented in the figures. That is why the length of the task makes no difference to the precautions.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/fragile.htm

  3. 3. High risk activitiescscs-102

    Someone is walking towards a roof area known to be weak. What must be there?

    • AA warning notice on the approachAnswer
    • BA verbal briefing at the morning meeting
    • CA note in the method statement
    • DA coloured mark on the sheets

    The notice goes where a person meets the danger, not in a folder in the office. On top of that come platforms, guard rails, restraint, arrest or nets, depending on the job. The people doing the work also have to be trained in those precautions.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/fragile.htm

  4. 4. High risk activitiescscs-103

    Which of these is a well known fragile roofing material?

    • AReinforced concrete slab
    • BNon-reinforced fibre-cement sheetAnswer
    • CCast iron decking
    • DSolid timber boarding

    Fibre cement sheets are fragile whatever the profile, and age makes them worse. Liner panels, corroded metal sheets, wired glass and rotted chipboard belong on the same list. None of them will hold a worker and the tools being carried.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/fragile.htm

  5. 5. High risk activitiescscs-104

    A tower scaffold has to be moved along a wall. What must be done first?

    • ATie the top to the wall
    • BReduce the height to no more than 4mAnswer
    • CAdd a second set of outriggers
    • DFit a ladder to the outside

    A tall tower on the move is easy to tip. Check the ground and look up for overhead lines before it goes anywhere. Push or pull from the base by hand, never with a vehicle.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/scaffold.htm

  6. 6. High risk activitiescscs-105

    Can a tower be moved with a worker still standing on the platform?

    • AYes, if they hold the guardrail
    • BYes, over short distances only
    • CNo, and not in windy conditions eitherAnswer
    • DYes, if a second person steadies it

    People and materials come off the tower before it moves, without exceptions. Wind is the other thing that turns a routine move into a fall. Falls while a tower was being moved are one of the main ways people get hurt on them.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/scaffold.htm

  7. 7. High risk activitiescscs-106

    One corner of a tower sits on soft ground, so a worker packs it up with blocks. What is wrong?

    • ABlocks must never carry any part of a towerAnswer
    • BThe blocks must be wetted first
    • CTwo blocks would be needed, not one
    • DNothing, if the blocks are new

    Bricks and building blocks crack and shift under load, and the tower goes over. The tower stands on firm level ground with the castors locked or the base plates properly supported. Where the manual calls for stabilisers or outriggers, they go on too.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/scaffold.htm

  8. 8. High risk activitiescscs-107

    What is the danger that has killed most operators working in the basket of a mobile elevating work platform (MEWP)?

    • ABeing trapped against a fixed structureAnswer
    • BThe battery catching fire
    • CLosing radio contact with the ground
    • DDropping tools onto the controls

    Working under steelwork or in tight overhead spaces is where it happens, and the operator can be pushed onto the controls and unable to stop the machine. Machines with shrouded controls reduce it. Keeping the platform tidy also stops trips and lost balance.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/mewp.htm

  9. 9. High risk activitiescscs-108

    What has to happen to the outriggers before a MEWP platform is raised?

    • AThey must be extended and chockedAnswer
    • BThey must be greased and folded
    • CThey must be removed on hard ground
    • DThey must be tied to the frame

    The outriggers are what keep the machine upright once the boom goes out. Spreader plates may be needed as well, and the manual says when. Trenches, manholes and loose backfill under one leg are a common cause of overturning.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/mewp.htm

  10. 10. High risk activitiescscs-109

    What must be arranged before someone works alone in a raised MEWP basket?

    • AA radio check every fifteen minutes
    • BA rescue plan that has been practisedAnswer
    • CA second machine parked nearby
    • DA written permit from the client

    Somebody on the ground has to know what to do and how to work the ground controls. A plan nobody has rehearsed is not a plan when a man is hanging in a basket. Barriers around the base also keep dropped tools off the people below.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/mewp.htm

  11. 11. High risk activitiescscs-110

    How often must a competent person inspect the sides of a trench that people work in?

    • AAt the start of each shiftAnswer
    • BOnce a week
    • COnly when the depth changes
    • DAt the end of the job

    It is also inspected after anything that could weaken it, such as heavy rain, a vehicle passing close or a fall of earth. Faults get put right straight away and nobody goes back in until they are. A written report follows most inspections.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/excavations.htm

  12. 12. High risk activitiescscs-111

    About how much can one cubic metre of soil weigh?

    • AUnder 100 kilograms
    • BAbout 300 kilograms
    • CMore than 1.5 tonnesAnswer
    • DAbout 10 tonnes

    A small fall of earth is enough to crush a person's chest so they cannot breathe. That is why no ground can be relied on to stand up by itself. Support or battering is decided before the digging starts, not after a wall moves.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/excavations.htm

  13. 13. High risk activitiescscs-112

    A dumper is parked right beside an open trench while it waits to be loaded. Why is that a problem?

    • AThe extra weight can collapse the sideAnswer
    • BThe engine noise disturbs the diggers
    • CExhaust fumes settle in the trench
    • DThe driver cannot see the trench bottom

    Load near the edge is carried by the ground holding the trench wall up, and it does not take much to push it past its limit. Spoil heaps do the same thing. Keep plant, vehicles and material back from the edge.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/excavations.htm

  14. 14. High risk activitiescscs-113

    Besides collapse, what else must be prevented around an open excavation under the construction regulations?

    • APeople or material falling into itAnswer
    • BWater being pumped out of it
    • CMachines working within ten metres of the edge
    • DAny work after dark

    Barriers, guard rails and toe boards keep people, tools and spoil out of the hole. The regulations also say the ground next to the edge must not be overloaded. All three points come from the same rule about excavations.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/22

  15. 15. High risk activitiescscs-114

    What makes a place a confined space in law?

    • AIt is smaller than a normal room
    • BIt has only one way in and out
    • CIt is enclosed and has a specified riskAnswer
    • DIt is below ground level

    Size is not the test. A grain silo counts and so does a shallow chamber, if the enclosure brings a foreseeable risk such as fire, explosion, loss of consciousness, asphyxiation or drowning. That is why some large spaces are confined spaces and some small ones are not.

    Sourcehttps://www.hse.gov.uk/confinedspace/introduction.htm

  16. 16. High risk activitiescscs-115

    Under the Confined Spaces Regulations 1997, when may a worker enter one?

    • AWhenever a permit has been signed
    • BOnly if the job cannot be done without enteringAnswer
    • CWhenever a second worker waits outside
    • DWhenever the air has been tested once

    The first duty is to keep out and do the work from outside if that is possible at all. Only when it is not does the safe system of work come into play. A permit records the controls; it does not make the entry necessary.

    Sourcehttps://www.legislation.gov.uk/uksi/1997/1713/regulation/4

  17. 17. High risk activitiescscs-116

    A man collapses inside a chamber. What is wrong with going straight in after him?

    • AYou need permission from the client first
    • BWhatever overcame him will overcome youAnswer
    • CYou may damage evidence for the inquiry
    • DYou should wait for daylight

    Would be rescuers make up a large share of the dead in these incidents, because the air that dropped the first man has not changed. Rescue arrangements and equipment have to be in place before anyone enters. Calling the emergency services and waiting is not a rescue plan on its own.

    Sourcehttps://www.hse.gov.uk/confinedspace/introduction.htm

  18. 18. High risk activitiescscs-117

    A tank was tested and found safe to enter yesterday. What should you do today?

    • AEnter, since nothing has been done to it
    • BEnter, but keep the lid open
    • CTreat it as unsafe until it is checked againAnswer
    • DEnter with a colleague watching

    Conditions change on their own. In one case water got into a compartment, the rusting used up the oxygen, and three men died. Yesterday's test says nothing about today's air.

    Sourcehttps://www.hse.gov.uk/confinedspace/introduction.htm

  19. 19. High risk activitiescscs-203

    Load bearing parts of a building are to be altered. What has to happen first?

    • AA quick look round by the site foreman
    • BA note to the client after work starts
    • CA full survey and assessment by a competent personAnswer
    • DNothing, if the building looks sound

    The survey weighs the age of the structure, what it was used for, how it was built and what stands next to it. On top of that, the client has to hand over a refurbishment or demolition survey done by a competent surveyor.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/buildings.htm

  20. 20. High risk activitiescscs-204

    Who decides whether temporary support is needed to stop a structure collapsing?

    • AA suitably qualified and experienced engineerAnswer
    • BThe operator of the excavator
    • CThe first worker on site that morning
    • DThe driver who delivers the props

    Bracing and propping are drawn up by temporary works designers, then installed, checked, inspected, maintained and taken down to that design. What goes in has to stand the loads that can reasonably be expected.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/buildings.htm

  21. 21. High risk activitiescscs-205

    When do the arrangements for a demolition job have to be written down?

    • AOn the day the job finishes
    • BOnly if the client asks for them
    • CBefore the work beginsAnswer
    • DOnly when something goes wrong

    The written method sets the order of removal that keeps the building standing until it is meant to come down. It also fixes exclusion zones and safe areas, so people know where they must not be while a section comes away.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/buildings.htm

  22. 22. High risk activitiescscs-213

    What must a buttress or temporary support on a site be able to do?

    • AHold twice the weight of the heaviest worker
    • BStay in place for at least a month
    • CWithstand any foreseeable loads put on itAnswer
    • DBe moved by hand without help

    It also has to be designed, installed and maintained for that purpose, and used only for the purpose it was designed and installed for. A prop borrowed from one job for another is outside what the design allowed for.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/19

  23. 23. High risk activitiescscs-214

    Spoil and materials are being stacked on a suspended floor slab. What does the law say?

    • AAny load is allowed while the slab is new
    • BLoading is a matter for the client alone
    • COnly wet materials count towards the load
    • DIt must not be loaded so as to become unsafeAnswer

    Where work could make a new or existing structure unstable, or leave it weak for a while, all practicable steps have to be taken to stop it coming down. Stacking material is one of the easiest ways to break that rule without noticing.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/19

  24. 24. High risk activitiescscs-215

    How does the law require demolition or dismantling to be approached?

    • AStarted quickly to shorten the exposure
    • BLeft to whoever knows the building best
    • CPlanned and carried out so as to prevent dangerAnswer
    • DDecided by the machine operator on the day

    Where danger cannot be prevented outright it has to be cut to as low a level as is reasonably practicable. That is a duty about the method, not about the paperwork, although the arrangements have to be recorded as well.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/20

  25. 25. High risk activitiescscs-216

    When may an explosive charge be fired on a site?

    • AWhenever the ground crew are ready
    • BOnce the neighbours have been told
    • CAt any time outside working hours
    • DOnly when nobody is exposed to risk of injuryAnswer

    That takes in flying and projected material as well as the blast itself. Explosives also have to be stored, transported and used safely and securely, so far as is reasonably practicable, not just fired carefully.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/21

  26. 26. High risk activitiescscs-217

    Overhead power lines cross the area a crane has to work in. What are the two answers the law gives first?

    • APaint them, or mark them with bunting
    • BDivert them away, or isolate and earth themAnswer
    • CWork at night, or work more slowly
    • DWarn the operator, or fit a mirror

    Both remove the danger rather than manage it. Only where neither can reasonably be done does the law move on to notices, barriers and suspended protections. The choice is not between them and doing nothing.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/25

  27. 27. High risk activitiescscs-218

    Overhead lines cannot be diverted or switched off. What must go up as well as the physical measures?

    • AA note in the health and safety file
    • BA letter to the electricity company
    • CA record in the accident book
    • DSuitable warning noticesAnswer

    The notices go with barriers that keep unneeded plant out, or suspended protections where vehicles have to pass beneath, or something giving the same level of safety. Notices on their own are not enough.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/25

  28. 28. High risk activitiescscs-219

    Work is going on beside deep water. Besides stopping a fall, what does the law require?

    • AA lifebelt kept in the site office
    • BA telephone number for the coastguard
    • CRescue equipment kept ready and maintainedAnswer
    • DA swimming test for everyone involved

    The point is a prompt rescue, so the gear has to be where the fall would happen and in working order. The risk of drowning after a fall has to be cut down as well, which is what buoyancy aids are for.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/26

  29. 29. High risk activitiescscs-220

    Workers are ferried out to a job by boat. What does the law say about the boat?

    • AIt must not be overcrowded or overloadedAnswer
    • BIt must carry a radio and a flag
    • CIt must be under ten years old
    • DIt must be crewed by two people

    Safe transport by water is a duty in its own right, not a detail of the job at the other end. Getting people there and back is treated as part of the construction work, and the same care applies to it.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/26

  30. 30. High risk activitiescscs-221

    Which three risks does one regulation of CDM 2015 group together?

    • ANoise, vibration and dust
    • BFalls, slips and manual handling
    • CFire or explosion, flooding, and asphyxiationAnswer
    • DTheft, vandalism and trespass

    They are grouped because each one can fill or overwhelm a space faster than people can get out of it. Steps to prevent injury from all three have to be taken so far as is reasonably practicable.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/29

  31. 31. High risk activitiescscs-222

    What has to be in place before anyone enters a confined space?

    • AA second worker somewhere on the site
    • BA signed copy of the site rules
    • CA torch and a mobile phone
    • DSuitable arrangements for rescue in an emergencyAnswer

    The arrangements come first, before entry, not after something goes wrong. They also have to cut the risk to whoever would carry out the rescue, because untrained rescuers are a large share of the deaths.

    Sourcehttps://www.legislation.gov.uk/uksi/1997/1713/regulation/5

  32. 32. High risk activitiescscs-223

    Confined space work carries a risk where someone may need to be revived. What must be provided?

    • AA stretcher at the site entrance
    • BA doctor on the premises
    • CEquipment to carry out resuscitationAnswer
    • DA hospital booked in advance

    It has to be provided and maintained, which means checked and ready rather than stored and forgotten. When the emergency comes, the arrangements have to be put into operation straight away.

    Sourcehttps://www.legislation.gov.uk/uksi/1997/1713/regulation/5

  33. 33. High risk activitiescscs-224

    What does the law require of every lifting operation?

    • AA second crane standing by as a spare
    • BA written report to the client each time
    • CTwo trained operators sitting in the cab
    • DPlanning by a competent person and supervisionAnswer

    The third part is that it is carried out safely. A lifting operation means any lifting or lowering of a load, so a small chain block counts as much as a tower crane does.

    Sourcehttps://www.legislation.gov.uk/uksi/1998/2307/regulation/8

  34. 34. High risk activitiescscs-225

    Choosing equipment for work at height, what comes first in law?

    • APersonal protection ahead of collective protection
    • BCollective protection before personal protectionAnswer
    • CWhatever is already on the site
    • DWhatever is cheapest to hire

    A guard rail or a net protects everyone there without them doing anything. A harness protects one person, and only if it is worn, fitted and clipped on correctly. That is why the order runs the way it does.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/7

  35. 35. High risk activitiescscs-226

    Which of these must be weighed when picking equipment for work at height?

    • AThe age of the person doing the job
    • BThe colour of the equipment
    • CThe name of the hire company
    • DThe distance and consequences of a potential fallAnswer

    So must the working conditions, how long and how often the equipment is used, how easily people could be evacuated and rescued, and any risk from putting the equipment up or taking it down.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/7

  36. 36. High risk activitiescscs-227

    What is the first duty an employer has about asbestos?

    • ATo issue masks to everyone on site
    • BTo warn workers at the morning briefing
    • CTo prevent exposure so far as is reasonably practicableAnswer
    • DTo keep a record of who was in the area

    Only where preventing it is not reasonably practicable does the law move on to reducing it, and even then the number of people exposed at any one time has to be kept as low as it reasonably can be.

    Sourcehttps://www.legislation.gov.uk/uksi/2012/632/regulation/11

  37. 37. High risk activitiescscs-228

    Where asbestos exposure cannot be prevented, what does the law say about breathing protection?

    • AExposure must be cut by other means firstAnswer
    • BIt is the main control to rely on
    • CIt replaces the need for ventilation
    • DIt is only needed for licensed work

    Work processes, engineering controls, suitable equipment and control at source come first, and a mask is provided in addition to them. Reversing that order leaves the fibres in the air and one thin barrier against them.

    Sourcehttps://www.legislation.gov.uk/uksi/2012/632/regulation/11

  38. 38. High risk activitiescscs-249

    What does the law say about working on or near a fragile surface?

    • AIt is allowed if the job takes under an hour
    • BAvoid it where the work can be done safely otherwiseAnswer
    • CIt is allowed if a second person watches
    • DIt is allowed if the weather is dry

    Only where the work genuinely cannot be done another way do platforms, coverings and guard rails come in, carrying any foreseeable load. If a risk of falling still remains, the distance and consequences have to be cut down.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/9

  39. 39. High risk activitiescscs-250

    Rubble is being cleared from an upper floor. What does the law forbid?

    • ALoading it into any kind of container
    • BClearing it before the end of the shift
    • CUsing a wheelbarrow to move it
    • DThrowing or tipping it down where it may injureAnswer

    First comes stopping material falling at all, then stopping anyone being struck by what does fall. Storage counts too: materials have to be stacked so they cannot collapse, overturn or shift on their own.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/10

  40. 40. High risk activitiescscs-251

    How often must the surface and edge protection of a place of work at height be checked?

    • AOnce a month
    • BOnce at the start of the whole contract
    • COn each occasion before it is usedAnswer
    • DOnly after bad weather

    This is the quick check before anyone steps on, separate from the formal inspections a scaffold gets. It covers the surface itself and every parapet, permanent rail or other fall protection at that place.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/13

  41. 41. High risk activitiescscs-252

    Which schedule of the work at height rules does a ladder have to meet?

    • AThere is a schedule for laddersAnswer
    • BLadders are outside the rules
    • CLadders follow the scaffold schedule
    • DLadders follow the net schedule

    Guard rails and toe boards, working platforms, scaffolding, nets and airbags, and each kind of personal fall protection all have their own schedule as well. Being allowed to use a ladder does not mean any ladder in any state.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/8

  42. 42. High risk activitiescscs-335

    A gang is handed harnesses and lanyards as the first answer to a job at height. What is wrong with that?

    • AHarnesses need a doctor's certificate
    • BHarnesses may only be used indoors
    • CLower steps come only after higher onesAnswer
    • DHarnesses are banned in construction

    The hierarchy has to be worked down in order, and lower steps come only after higher ones have been ruled out as not reasonably practicable.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/assess.htm

  43. 43. High risk activitiescscs-336

    What four steps does HSE set out for assessing a job above ground level?

    • AAssess, decide, record, reviewAnswer
    • BReport, record, retain, renew
    • CWarn, watch, withdraw, write
    • DPlan, price, procure, proceed

    Each step feeds the next: assess, decide, record, review, with the significant findings written down and the whole thing looked at again when the job changes.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/assess.htm

  44. 44. High risk activitiescscs-337

    The top level of the work at height hierarchy is avoidance. What does a real example look like?

    • AIssuing every worker with a harness
    • BShortening the shift on the scaffold
    • CAdding a second man at the ladder foot
    • DFitting guard rails to steel on the groundAnswer

    Avoidance means the work never happens up there at all, so fitting guard rails to steel on the ground and craning the lot into place is the model case.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/assess.htm

  45. 45. High risk activitiescscs-338

    Which regulations require the assessment that decides whether the confined space rules bite?

    • AThe Work at Height Regulations 2005
    • BThe Management Regulations 1999Answer
    • CThe Lifting Operations Regulations 1998
    • DThe Provision of Work Equipment Regulations

    The assessment duty is general rather than special, so the Management Regulations 1999 carry it: name the hazards, weigh the risks and decide what precautions the job needs.

    Sourcehttps://www.hse.gov.uk/confinedspace/legislation.htm

  46. 46. High risk activitiescscs-339

    What is the first duty the Confined Spaces Regulations 1997 place on an employer?

    • AAvoid entry, working from outside if possibleAnswer
    • BIssue breathing apparatus to everyone
    • CPost a warning notice on the opening
    • DTest the air on the day before entry

    The safest confined space is the one nobody goes into, so the first duty is to avoid entry, working from outside if possible, before any method is even drawn up.

    Sourcehttps://www.hse.gov.uk/confinedspace/legislation.htm

  47. 47. High risk activitiescscs-340

    Going in cannot be avoided on a particular job. What must follow?

    • AA written note to the enforcing authority
    • BA doctor's clearance for each worker
    • CA safe system of work for the entryAnswer
    • DA permit signed by the local council

    Once entry is unavoidable the law turns to method, so a safe system of work for the entry has to be settled before anyone climbs in.

    Sourcehttps://www.hse.gov.uk/confinedspace/legislation.htm

  48. 48. High risk activitiescscs-341

    An airtight store is held at low oxygen on purpose so that nothing can catch fire. What is that room in law?

    • AAn ordinary store with a warning sign
    • BA place needing a fire assessment only
    • CA restricted area under building control
    • DA confined space under the 1997 rulesAnswer

    The test is the atmosphere and the enclosure, not the trade going on inside, so a room deliberately kept short of oxygen is a confined space under the 1997 rules.

    Sourcehttps://www.hse.gov.uk/confinedspace/hypoxic-environments.htm

  49. 49. High risk activitiescscs-342

    A low oxygen system has been fitted in a building. What belongs at the door?

    • AA list of everyone trained to enter
    • BA notice that this is a confined spaceAnswer
    • CA copy of the fire risk assessment
    • DA record of the last air test taken

    Nothing about a low oxygen room looks dangerous from the corridor, so a notice that this is a confined space goes up, with entry held back by keys or passes.

    Sourcehttps://www.hse.gov.uk/confinedspace/hypoxic-environments.htm

  50. 50. High risk activitiescscs-343

    The assessment for a low oxygen system asks where the vented gases go. Why does that matter?

    • AVented gas can be rich in carbon dioxideAnswer
    • BVented gas damages the roof covering
    • CVented gas has to be metered for billing
    • DVented gas must be returned to the tank

    Whatever leaves the room has to go somewhere safe, and vented gas can be rich in carbon dioxide, while a raised oxygen concentration brings dangers of its own.

    Sourcehttps://www.hse.gov.uk/confinedspace/hypoxic-environments.htm

  51. 51. High risk activitiescscs-344

    Why is a sealed wood pellet hopper treated as a confined space?

    • ABecause it is fitted with a screw feeder
    • BBecause it stands next to a boiler
    • CBecause the air inside can turn toxic and thinAnswer
    • DBecause it is filled by a tanker lorry

    Wood pellets give off gas and use up oxygen as they sit, so the air inside can turn toxic and thin, and that is what makes the hopper a confined space.

    Sourcehttps://www.hse.gov.uk/confinedspace/wood-pellet-fuels.htm

  52. 52. High risk activitiescscs-345

    A householder died after climbing into a bulk wood pellet hopper. What killed him?

    • AA fall onto the auger inside
    • BCarbon monoxide in the hopperAnswer
    • CA dust explosion from the pellets
    • DA collapse of the pellet stack

    The gas gives no warning of any kind, and carbon monoxide in the hopper was what overcame him, which is why these tanks are treated as confined spaces and not as bins.

    Sourcehttps://www.hse.gov.uk/confinedspace/wood-pellet-fuels.htm

  53. 53. High risk activitiescscs-346

    What is the plain advice to anyone standing at a wood pellet hopper?

    • AOpen the lid and let it air for an hour
    • BLook inside only with a torch to hand
    • CReach in only up to the elbow
    • DNever enter it or put your head inAnswer

    One breath is enough where the gas has built up, so the rule is blunt: never enter it or put your head in, whatever the reason seems to be.

    Sourcehttps://www.hse.gov.uk/confinedspace/wood-pellet-fuels.htm

  54. 54. High risk activitiescscs-347

    What do the work at height rules ask of the employee?

    • AReasonable care and co-operationAnswer
    • BBuying his own fall arrest kit
    • CWriting his own method statement
    • DInspecting the scaffold each morning

    The duty is general rather than technical: reasonable care and co-operation, so that the arrangements made above him actually work on the day.

    Sourcehttps://www.hse.gov.uk/work-at-height/the-law.htm

  55. 55. High risk activitiescscs-348

    Where does the law say the measures for a job at height have to come from?

    • AFrom the manufacturer's handbook
    • BFrom the client's own site rules
    • CFrom the risk assessment made firstAnswer
    • DFrom the insurer's own schedule

    Equipment is picked against the danger of the particular job, so the measures come from the risk assessment made first under the Management Regulations.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/6

  56. 56. High risk activitiescscs-349

    What is a work restraint system meant to do?

    • ACatch a worker after a short fall
    • BHold a ladder against a wall
    • CSlow a descent down a rope
    • DStop a worker reaching a fall positionAnswer

    This is prevention, not rescue: the lanyard is short enough to stop a worker reaching a fall position, so there is never a fall to arrest.

    Sourcehttps://www.hse.gov.uk/work-at-height/step-by-step-guide.htm

  57. 57. High risk activitiescscs-350

    Where do ladders sit when equipment for a job above ground is being chosen?

    • AThey are the usual first choice
    • BThey are not the automatic first choiceAnswer
    • CThey are barred from all sites
    • DThey are allowed only for inspections

    They suit short jobs where the danger is small and nothing more, so they are not the automatic first choice, even though the law does not forbid them.

    Sourcehttps://www.hse.gov.uk/work-at-height/ladders/index.htm

  58. 58. High risk activitiescscs-351

    What does CDM 2015 name among the practicable steps against an excavation collapsing?

    • ASupports or battering of the sidesAnswer
    • BPumping the water out each morning
    • CA fence set two metres back
    • DA warning sign at the top of the ramp

    The ground has to be held or laid back rather than merely watched, so the regulation names supports or battering of the sides among the steps to take.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/22

  59. 59. High risk activitiescscs-352

    Besides the start of a shift, when else does an excavation have to be looked at again?

    • AEvery Monday, whatever has happened
    • BOnce the depth passes two metres
    • CAfter anything that may affect stabilityAnswer
    • DOnly when the client asks to see it

    A trench that stood yesterday is a different trench after rain or a heavy load, so it is inspected again after anything that may affect stability, and after any fall of material.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/22

  60. 60. High risk activitiescscs-353

    What does HSE ask a site to do about where things get put down?

    • AKeep everything inside a locked container
    • BSet aside areas for each kind of materialAnswer
    • COrder materials only on the day of use
    • DStack everything against the hoarding

    Things left where they land are what people fall over, so the advice is to set aside areas for each kind of material: plant, waste, flammables and hazardous substances alike.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/storage.htm

  61. 61. High risk activitiescscs-354

    How must materials be stored under the work at height rules?

    • ASo they are out of the rain
    • BSo they are within reach of the hoist
    • CSo they are sorted by trade
    • DSo they cannot collapse or shiftAnswer

    A stack that topples reaches people standing nowhere near the edge, so materials go up so they cannot collapse or shift unintentionally.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/10

  62. 62. High risk activitiescscs-355

    Where do most of the serious telehandler injuries happen?

    • AReversing into someone, or overturningAnswer
    • BRefuelling the machine at the tank
    • CClimbing into and out of the cab
    • DCoupling attachments to the boom

    The machine is at its most dangerous while doing its job, not while parked: reversing into someone, or overturning under a load, account for most of the deaths.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/telescopic.htm

  63. 63. High risk activitiescscs-356

    What do the Electricity at Work Regulations 1989 say about work carried out near an electrical system?

    • AIt is allowed only after 6pm
    • BIt needs a permit from the supplier
    • CIt must be done in pairs at all times
    • DIt must not give rise to dangerAnswer

    The rule reaches past the man touching the wires: work near a system must not give rise to danger either, so far as is reasonably practicable.

    Sourcehttps://www.legislation.gov.uk/uksi/1989/635/regulation/4

  64. 64. High risk activitiescscs-357

    Two things have to be held down to keep the fire risk low on a site. Which two?

    • AWater supply and escape routes
    • BCombustible material and ignition sourcesAnswer
    • CWorking hours and site lighting
    • DDeliveries and waste collections

    Fire needs fuel and a spark in the same place, so the pair to attack is combustible material and ignition sources, keeping the quantity low and the sources away.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/processfire.htm

  65. 65. High risk activitiescscs-358

    Who besides the operator has to be trained on a piece of work equipment?

    • AThe person who supplied it
    • BThe site first aider on duty
    • CAnyone who supervises its useAnswer
    • DThe client's own surveyor

    A supervisor who does not know the risks cannot spot a wrong method, so anyone who supervises its use is trained as well as the man on the handles.

    Sourcehttps://www.legislation.gov.uk/uksi/1998/2306/regulation/9

  66. 66. High risk activitiescscs-359

    Where must a safety net be rigged in relation to the work going on above it?

    • AClose to the level of the workAnswer
    • BAt least six metres below it
    • COn the ground floor slab
    • DLevel with the scaffold base

    A long drop into a net still injures the person who takes it, so the net goes close to the level of the work, keeping the fall short as well as caught.

    Sourcehttps://www.hse.gov.uk/work-at-height/step-by-step-guide.htm

  67. 67. High risk activitiescscs-391

    What does CDM 2015 require of energy distribution installations on a site?

    • AThat they are switched off at night
    • BThat they are owned by the contractor
    • CThat they are placed, checked and markedAnswer
    • DThat they are buried a metre down

    A cable nobody knows about is the one that gets cut, so the rule is that they are placed, checked and marked plainly enough to be seen before a spade goes in.

    Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/25

  68. 68. High risk activitiescscs-392

    Planning a job above ground level covers more than the method. What else must it take in?

    • AThe cost of hiring the equipment
    • BThe order in which trades arrive
    • CThe parking for the site vans
    • DEmergencies and rescueAnswer

    A man hanging in a harness has minutes rather than hours, so the planning has to take in emergencies and rescue before anybody leaves the ground.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/4

  69. 69. High risk activitiescscs-393

    Fixed guards cannot be fitted to a dangerous part. What does the law call for next?

    • AGuards or devices of another kindAnswer
    • BA notice warning of the danger
    • CA second operator standing by
    • DShorter shifts on that machine

    The list runs down in strict order, so guards or devices of another kind come next, and only after those the jigs, holders and push-sticks.

    Sourcehttps://www.legislation.gov.uk/uksi/1998/2306/regulation/11

  70. 70. High risk activitiescscs-394

    When does a live conductor fall outside the ban on working on or near it?

    • AWhen it carries less than 110 volts
    • BWhen it is suitably insulated overAnswer
    • CWhen the work takes under an hour
    • DWhen a second person is watching

    The danger is contact with the metal rather than nearness to the cable, so the ban lifts when it is suitably insulated over, well enough to prevent danger.

    Sourcehttps://www.legislation.gov.uk/uksi/1989/635/regulation/14

  71. 71. High risk activitiescscs-395

    A tower has just been assembled in position. What comes before anyone uses it?

    • AA note in the site diary about it
    • BA test load hung from the platform
    • CAn inspection in that positionAnswer
    • DA signature from the client

    Assembly is where the mistakes get built in, so an inspection in that position comes before anybody climbs on, not after the first shift.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/12

  72. 72. High risk activitiescscs-445

    Which of these jobs requires at least one other person present, so cannot be done alone?

    • AWork in a confined spaceAnswer
    • BRoof repairs on a single storey building
    • CPainting the inside of an empty unit
    • DCleaning tools at the end of a shift

    Confined space work is named as high-risk work needing more than one person: a supervisor may need to be present and somebody has to be in a rescue role. The same list covers work near exposed live conductors, diving, vehicles carrying explosives and fumigation. Outside that list, working alone is judged case by case on the risk assessment.

    Sourcehttps://www.hse.gov.uk/lone-working/employer/manage-the-risks-of-working-alone.htm

  73. 73. High risk activitiescscs-446

    Why does working alone carry more risk than the same job done alongside others?

    • AThere is nobody to help if something goes wrongAnswer
    • BLone workers are given older equipment as a rule
    • CThe law bans lone workers from using power tools
    • DInsurance does not cover anyone working by themselves

    The extra risk is plain: no direct supervision and nobody there to help when things go wrong. That is why the controls centre on contact and rescue rather than on the task itself. It is also why a small injury that would be trivial in company can turn serious for somebody working alone in an isolated spot.

    Sourcehttps://www.hse.gov.uk/lone-working/employer/index.htm

  74. 74. High risk activitiescscs-447

    A lone worker finishes a task at a remote part of the site. What must the arrangements include?

    • AA reliable way of confirming they have got back to baseAnswer
    • BA written report of the task posted the following day
    • CA phone call only if they have had an accident
    • DNothing further, once the task itself is complete

    Keeping in touch has to work in both directions and has to close the loop at the end. A system that confirms the person has returned is what turns silence into a signal rather than into an assumption. Agreed contact intervals, an alarm they can raise, and testing all of it regularly complete the arrangement.

    Sourcehttps://www.hse.gov.uk/lone-working/employer/training-supervision-monitoring.htm

  75. 75. High risk activitiescscs-448

    How much supervision should a lone worker get?

    • AAs much as the risk assessment says the risk needsAnswer
    • BThe same amount for everyone, regardless of the job
    • CNone, because supervision defeats the point of lone working
    • DA daily visit from a manager, whatever the task

    Supervision is set by the assessment: the higher the risk, the more of it is needed, adjusted for how well the person spots and handles problems themselves. A new starter, someone in training, or anyone facing a job with specific risks should be supervised at first. Lone working does not mean unsupervised working.

    Sourcehttps://www.hse.gov.uk/lone-working/employer/training-supervision-monitoring.htm

  76. 76. High risk activitiescscs-449

    A lone worker's first language is not English. What extra duty does that create?

    • AMake sure they have received and understood the trainingAnswer
    • BProvide a translator on site at all times
    • CStop them from working alone until they learn English
    • DNothing extra, provided the notices are printed clearly

    The test is understanding, not delivery. Someone from outside the country may meet unfamiliar risks in a workplace culture very different from their own, so information, instruction and training have to land, not just be handed over. Printed notices in English do not clear the duty and neither does a signature on an induction sheet.

    Sourcehttps://www.hse.gov.uk/lone-working/employer/training-supervision-monitoring.htm

  77. 77. High risk activitiescscs-456

    Where do most fatal and serious injuries involving a MEWP come from?

    • AEntrapment, overturning, falling and collisionAnswer
    • BEngine fires and hydraulic fluid burns
    • CNoise and hand-arm vibration over long shifts
    • DManual handling of the machine's own equipment

    Four hazards account for the serious harm: being trapped between the basket and a fixed structure, the machine going over, falling out of the basket, and hitting people, cables or other vehicles. All four have to be named in the risk assessment before the job starts. Note that they come from working the machine, not from driving it about the site.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/mewp.htm

  78. 78. High risk activitiescscs-457

    Work has to be done in tight steelwork overhead. What kind of MEWP should be chosen?

    • AOne whose controls are shrouded or otherwise protectedAnswer
    • BAny machine, so long as the operator wears a harness
    • CThe tallest machine available on the site that day
    • DOne with the widest basket, to give room to move

    The danger in confined overhead areas is being pushed onto the controls and pinned there, unable to stop the machine. Machines designed to prevent that accidental contact exist and should be selected for such work. Operators also need briefing on the hazard and on the safe system to follow, because reach and height alone do not make a machine right for the job.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/mewp.htm

  79. 79. High risk activitiescscs-458

    Why does it matter that the floor of a raised basket is kept clear?

    • AClutter makes tripping or losing balance up there more likelyAnswer
    • BLoose items add enough weight to overturn the machine
    • CIt is required so that the basket can be washed each evening
    • DClutter blocks the flow of air to the machine's engine

    A tidy platform reduces the chance of the operator tripping or losing balance while in the basket, and a stumble at height is a different matter from a stumble on the ground. It is one of the cheapest controls on the list and the easiest to skip. Ground conditions and the choice of machine deal with overturning; tidiness deals with the person.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/mewp.htm

  80. 80. High risk activitiescscs-91

    What are the Work at Height Regulations 2005 there to do?

    • ASet a minimum height for using a harness
    • BPrevent death and injury from fallingAnswer
    • CLicence the companies that erect scaffolds
    • DDecide who pays for access equipment

    There is no height below which the rules stop applying, because people are killed by short falls too. The regulations reach employers and anyone else who controls work at height. What matters is the risk of the fall, not the number of metres.

    Sourcehttps://www.hse.gov.uk/work-at-height/the-law.htm

  81. 81. High risk activitiescscs-92

    Three things are required of anyone in control of work at height. What are they?

    • APlanning, supervision and competent workersAnswer
    • BInsurance, a permit and a signed method
    • CA harness, a helmet and a lanyard
    • DA ladder, a spotter and good weather

    The job is thought through first, someone keeps an eye on it, and the people doing it know what they are doing. Simple low risk tasks need less planning, not none. Choosing the right equipment is part of the planning, not a separate step.

    Sourcehttps://www.hse.gov.uk/work-at-height/the-law.htm

  82. 82. High risk activitiescscs-93

    What is the first question to ask before any job above ground level?

    • AWhich harness suits the task
    • BWhether the job can be done from the groundAnswer
    • CHow long the task will take
    • DWhether a permit has been issued

    If the work can safely be done another way, it must be. Extendable tools, assembling at ground level and lowering a mast are the usual ways of getting there. Only when that fails do you move on to preventing a fall.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/6

  83. 83. High risk activitiescscs-94

    Which protection should be chosen first when a fall cannot be designed out?

    • ACollective protection such as guard railsAnswer
    • BA harness and lanyard for each worker
    • CA watchman at the base of the structure
    • DA sign warning of the drop

    Collective measures protect everyone in the area without anyone having to clip on or remember anything. Personal kit protects one person and only if it is worn and attached properly. Nets and airbags come after that, to cut the distance and the damage.

    Sourcehttps://www.hse.gov.uk/work-at-height/step-by-step-guide.htm

  84. 84. High risk activitiescscs-95

    The wind gets up while a gang is fixing cladding at the top of a frame. What does the law say?

    • ACarry on if the harnesses are clipped
    • BStop: the weather must not endanger peopleAnswer
    • CCarry on until the supervisor arrives
    • DStop only if rain is forecast as well

    Weather is written into the rules, not left to the mood of the shift. If conditions put the people doing the work in danger, it stops. Emergency services acting in an emergency are the one exception.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/4

  85. 85. High risk activitiescscs-96

    A working platform on a construction job is high enough for someone to fall two metres or more. How often must it be inspected?

    • AOnce at the start of the contract
    • BEvery seven daysAnswer
    • CEvery month
    • DOnly after bad weather

    It also has to be inspected in the position it will be used in, so moving it means checking it again. The result of the inspection is written down and kept until the next one. A platform that has not been inspected in time should not be used.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/12

  86. 86. High risk activitiescscs-97

    How quickly must the report of a working platform inspection reach the person who asked for it?

    • AWithin 24 hoursAnswer
    • BWithin seven days
    • CWithin one month
    • DBefore the job is handed over

    The report is written before the end of the working period and passed on within a day. A fault found on Monday is no use to anyone if the paperwork lands on Friday. The employer then keeps the report on site while the work continues.

    Sourcehttps://www.legislation.gov.uk/uksi/2005/735/regulation/12

  87. 87. High risk activitiescscs-98

    How large a share of construction deaths involve work on roofs?

    • AAlmost one in fiveAnswer
    • BAbout one in fifty
    • CAbout half
    • DFewer than one in a hundred

    Many of the dead are not specialist roofers but people doing repairs or cleaning. Short jobs are the dangerous ones because the precautions get skipped. Falling from an edge or through a fragile sheet causes most of it.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/roofwork.htm

  88. 88. High risk activitiescscs-99

    What is the usual edge protection for work on a flat roof?

    • AA rope line at waist height
    • BA double guardrail and toeboardAnswer
    • CWarning tape on short posts
    • DA painted line one metre in

    Two rails stop a person going over and the board stops tools and materials going off the edge. Sloping roofs need scaffolding at the eaves instead, and on a terrace the back edge needs it as well as the front. Simple edge protection prevents most flat roof falls.

    Sourcehttps://www.hse.gov.uk/construction/safetytopics/roofwork.htm