- 1. Specialistcscs-118
Who must plan a lifting operation involving lifting equipment?
- AA competent personAnswer
- BThe crane driver alone
- CThe client's site agent
- DWhoever ordered the crane
The planner needs real knowledge and experience of the kind of lift being done. The operation then has to be supervised properly and carried out safely. Everyone slinging loads or directing the lift must be trained too.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/lifting-operations.htm
- 2. Specialistcscs-119
What must be marked on a gin wheel before it is used?
- AThe date it was bought
- BThe safe working loadAnswer
- CThe name of the hire company
- DThe height it may be fixed at
Without the figure nobody knows when the load is too heavy. The wheel also has to be fixed to a secure anchorage and fitted with a proper hook or a safety catch. Bent reinforcing bar used as a hook is how loads get dropped.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/lifting-operations.htm
- 3. Specialistcscs-120
A hoist is marked for goods only. May a worker ride up on it to save time?
- AYes, if the platform is empty
- BYes, if the operator agrees
- CNo, neverAnswer
- DYes, for one floor only
A goods hoist is not built or examined for carrying people. The marking states what it may carry, how many people if any, and the load it may safely take. Riding on it puts you where nothing is designed to catch you.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/lifting-operations.htm
- 4. Specialistcscs-121
How often must lifting equipment used to lift people be thoroughly examined?
- AAt least every 6 monthsAnswer
- BAt least every 12 months
- CAt least every 2 years
- DOnly before first use
Accessories for lifting are on the same six month cycle, while other lifting equipment goes to at least twelve months. An examination scheme drawn up by someone competent can set different intervals. Anything exceptional that could affect safety triggers another examination.
Sourcehttps://www.legislation.gov.uk/uksi/1998/2307/regulation/9
- 5. Specialistcscs-122
A hired telehandler arrives on site. What must come with it?
- AThe manufacturer's original invoice
- BEvidence of its last thorough examinationAnswer
- CA spare set of keys
- DA signed hire contract
Lifting equipment must not be used unless there is physical evidence that the last examination was carried out. It saves you trusting a stranger's word about a machine that lifts loads over people. Check it before the machine starts work, not after.
Sourcehttps://www.legislation.gov.uk/uksi/1998/2307/regulation/9
- 6. Specialistcscs-123
How often must a rigged safety net be inspected once it is in place?
- AWeeklyAnswer
- BDaily
- CMonthly
- DOnly at handover
It is checked after installation with a handover certificate, then weekly to confirm it is still fixed correctly and will still arrest a fall. Only trained and competent people rig, alter or de-rig a net. Rigging it from ground level should be considered first.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/safety-nets.htm
- 7. Specialistcscs-124
Someone falls into a safety net and is helped out unhurt. What happens to the net?
- AIt is left in place until the job ends
- BThe installer is told and work above stopsAnswer
- CIt is washed down and re-tensioned
- DIt is moved one bay along
A net that has taken a fall will almost certainly need replacing, because it absorbs the energy by deforming. Work above it stops until someone competent, usually the manufacturer, has looked at it. Carrying on over a used net is trusting something that may already be spent.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/safety-nets.htm
- 8. Specialistcscs-125
Why must there be clear space beneath a net?
- ATo let air circulate under it
- BSo the net can stretch without you hitting anythingAnswer
- CSo materials can be stored dry below
- DTo give the rescue team room to stand
The net saves you by deforming, and it needs room to do it. If there is a beam or a stack of blocks in that space, you hit that instead. The net is also hung as close as possible to the working level to keep the fall short.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/safety-nets.htm
- 9. Specialistcscs-126
Why is a life jacket preferred to a buoyancy aid for work over water?
- AIt is cheaper to hire
- BIt turns an unconscious person face upAnswer
- CIt is easier to swim in
- DIt floats for longer in cold water
Somebody knocked out by the fall cannot help themselves, and a buoyancy aid may leave them face down. Life jackets should ideally inflate on their own and be worn at all times. Anyone issued one has to be trained to use it.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/prevention-of-drowning.htm
- 10. Specialistcscs-127
What is the most immediate danger to a worker who falls into water?
- ADrowningAnswer
- BInfection from the water
- CHypothermia after several hours
- DDamage to hearing
Cold water shock, heavy wet clothing and any injury from the fall all work against you at once. That is why the alarm, the throw line and the rescue boat have to be ready before work starts. Fatigue and cold finish the job if rescue is slow.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/prevention-of-drowning.htm
- 11. Specialistcscs-128
During steel erection, what must never be done on the top flange of a beam?
- AWalking on itAnswer
- BBolting from a platform beside it
- CStraddling it while sitting
- DMarking it with chalk
Walking the top flange is banned outright, and it is how erectors are killed. Where a platform cannot reach, straddling an I beam is allowed for short specific jobs, sitting astride with feet on the bottom flange. Even then a harness and twin lanyard back it up.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/steel-erection.htm
- 12. Specialistcscs-129
What stops a partly built steel frame collapsing before it is finished?
- AErecting it as fast as possible
- BFollowing an agreed erection sequence with bracingAnswer
- CLeaving the crane hooked on overnight
- DAdding the cladding as you go up
The sequence is worked out with the frame designer or a structural engineer, and bracing, guys or stays hold the frame steady at every stage. The erectors have to be told about any special sequence they must follow. The arrangements get checked as the work goes on.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/steel-erection.htm
- 13. Specialistcscs-130
How much notice must be given to the local authority before demolition starts?
- AAt least 6 weeksAnswer
- BAt least 24 hours
- CAt least 7 days
- DNone is needed
Notice goes to the council's building control department, and it is better to talk to them before the contract is even awarded. That time is used for working hours, traffic, scaffold licences and possible road closures. The council may set conditions before it gives permission.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/demolition.htm
- 14. Specialistcscs-131
What survey must a client give the contractor before demolition work?
- AA refurbishment or demolition asbestos surveyAnswer
- BA land ownership search
- CA noise survey of the neighbourhood
- DA survey of the local traffic flow
It has to be done by a competent surveyor, and it goes to the contractor before work starts. Along with it comes information on structural stability, changes below ground and live services. Finding asbestos with a breaker is far too late.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/demolition.htm
- 15. Specialistcscs-132
Can a scaffold be used to justify making an exclusion zone smaller?
- AYes, if it is fully sheeted
- BYes, if it is tied to the building
- CNo, a scaffold does not reduce the zoneAnswer
- DYes, if it is designed by an engineer
The zone is sized on how far debris can travel, and a scaffold does not change that. Scaffolding must not be used to prop a structure unless it was designed to do so. Where there is not enough room for the zone, the method of demolition has to change.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/demolition.htm
- 16. Specialistcscs-133
What must temporary works such as propping and falsework be able to do?
- AWithstand the loads that may be put on themAnswer
- BBe reused on at least three projects
- CBe made only from steel components
- DBe removed within twenty eight days
They are designed, installed and maintained for the loads that can reasonably be expected, and used only for what they were designed for. Scaffolds, shoring, excavation supports and falsework all count. They are inspected regularly by someone competent.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/temporary-works.htm
- 17. Specialistcscs-134
What authority should a temporary works coordinator have?
- AAuthority to stop unsatisfactory workAnswer
- BAuthority to hire and dismiss workers
- CAuthority to change the contract price
- DAuthority to sign off the finished building
The role is worthless without the power to halt work that is not right. The coordinator makes sure designs are prepared, checked and built as drawn, and may also advise on the build sequence. On a simple job the main contractor can take the role and get engineering advice as needed.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/temporary-works.htm
- 18. Specialistcscs-135
Which of these counts as temporary works on a site?
- AThe finished roof covering
- BSite hoarding and welfare unitsAnswer
- CThe permanent drainage runs
- DThe landscaping at handover
Fencing, hoarding, site cabins and earth stockpiles that will be taken away later are all temporary works. So are haul roads and working platforms for cranes. Treating them as temporary works means they get designed and checked rather than just thrown up.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/temporary-works.htm
- 19. Specialistcscs-136
In which buildings might asbestos still be found?
- AOnly buildings put up before 1950
- BAny building built before the year 2000Answer
- COnly industrial buildings
- DOnly buildings with flat roofs
It was used heavily from the 1950s to the mid 1980s and was not banned outright until 1999. Ceiling tiles, pipe lagging, boilers and sprayed coatings are common places. Cutting or drilling into it is what puts the fibres in the air.
Sourcehttps://www.hse.gov.uk/construction/healthrisks/cancer-and-construction/asbestos.htm
- 20. Specialistcscs-137
How long can it take for an asbestos related disease to show itself?
- AA few days
- BAbout six months
- C15 to 60 yearsAnswer
- DIt always shows within five years
Nothing happens at the time, which is why people carry on working in it. The risk adds up over every exposure, so small jobs done often still count. Smoking raises the chance of lung cancer from asbestos a great deal.
Sourcehttps://www.hse.gov.uk/construction/healthrisks/cancer-and-construction/asbestos.htm
- 21. Specialistcscs-138
Which cancer is caused almost only by breathing asbestos fibres?
- AMesotheliomaAnswer
- BSilicosis
- CDermatitis
- DLegionnaires' disease
It attacks the lining of the lung and it is always fatal. Asbestos also causes lung cancer, asbestosis and thickening of the lung lining. This is the biggest occupational disease risk in the whole industry.
Sourcehttps://www.hse.gov.uk/construction/healthrisks/cancer-and-construction/asbestos.htm
- 22. Specialistcscs-139
Who holds the duty to manage asbestos in a factory or an office block?
- AWhoever last worked on the building
- BThe person responsible for its maintenance or repairAnswer
- CThe local fire authority
- DThe company that installed the asbestos
The duty follows the maintenance or repair obligation, or control of the premises where there is no such contract. Where several people share it, the split follows how much each is responsible for. Everyone else has to co-operate so the dutyholder can do it.
Sourcehttps://www.legislation.gov.uk/uksi/2012/632/regulation/4
- 23. Specialistcscs-140
You are about to start work in an older commercial building. What should you ask to see?
- AThe record of asbestos in the premisesAnswer
- BThe building's energy certificate
- CThe original architect's drawings
- DThe last fire alarm test sheet
The dutyholder has to record where asbestos is and what condition it is in, and make that record available to anyone doing work there. Reading it before you start tells you which walls and ceilings to leave alone. Employers must identify asbestos as part of the risk assessment before refurbishment or demolition.
Sourcehttps://www.legislation.gov.uk/uksi/2012/632/regulation/4
- 24. Specialistcscs-141
During refurbishment, what makes an old water system a legionella risk?
- AWater sitting still at 20 to 45 degreesAnswer
- BWater running at high pressure
- CWater treated with chlorine
- DWater stored below freezing
Stagnant warm water with rust or sludge in it is where the bacteria breed, and a spray then carries them into the air. Draining redundant systems and flushing outlets that are still used breaks the cycle. Stored water is kept below 20 degrees or, in a hot system, above 60.
- 25. Specialistcscs-142
What illness can legionella bacteria cause?
- AA serious form of pneumoniaAnswer
- BA skin rash on the hands
- CLoss of hearing
- DDamage to the kidneys only
Legionnaires' disease can kill, and there is a milder related illness as well. It is caught by breathing in contaminated droplets, not by drinking the water. People who are older or already ill are more likely to be badly affected.
- 26. Specialistcscs-143
How do workers catch Weil's disease on a site?
- AFrom the urine of infected ratsAnswer
- BFrom breathing brick dust
- CFrom contact with wet cement
- DFrom bites by insects in long grass
The bacteria get in through cuts, scratches or the lining of the mouth, throat and eyes. Refurbishment, demolition and work near canals, rivers or sewers carry the higher risk. It starts like flu and can lead to kidney failure.
- 27. Specialistcscs-144
You have a graze on your forearm and are clearing an old cellar. What should you do?
- ACover it with a waterproof dressingAnswer
- BLeave it open so it dries out
- CWash it only at the end of the day
- DWear a long sleeve over it and nothing else
A break in the skin is the way in for the bacteria in rat urine and for tetanus. Cover it with a waterproof dressing or a glove, and wash any new cut straight away with soap and running water. Take breaks away from the work area too.
- 28. Specialistcscs-145
How is tetanus usually picked up at work?
- AThrough a contaminated cut or woundAnswer
- BBy breathing dust from old plaster
- CBy drinking water from a site tap
- DThrough the skin of clean hands
The bacterium is common in soil and gets in through broken skin, then releases a poison causing muscle spasms and lockjaw. Vaccination makes it rare, and the jab is free from a doctor. Workers who have never been vaccinated should get medical advice about a deep dirty wound.
- 29. Specialistcscs-146
For which of these is health surveillance required by law?
- ANoise, asbestos and silica exposureAnswer
- BBlood pressure for everyone working on site
- CEyesight tests for all trades
- DFitness tests before each contract
Health surveillance is a set of ongoing checks aimed at catching harm early, and the law calls for it where certain exposures exist. Wellbeing checks such as blood pressure are worth doing but are not the same thing. If a check finds a problem, the controls get reviewed as well as the person treated.
Sourcehttps://www.hse.gov.uk/construction/healthrisks/managing-essentials/health-surveillance.htm
- 30. Specialistcscs-147
A contractor is about to set up a new site. What must be arranged before work starts?
- ASteps to keep unauthorised people outAnswer
- BA press notice to the neighbours
- CA meeting with the insurance company
- DA photograph of the empty plot
Contractors must not begin until reasonable steps have been taken to prevent unauthorised access. Suitable welfare has to be there from the start as well, not brought in later. Every worker under their control also needs a site specific induction.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/contractors.htm
- 31. Specialistcscs-148
What must a contractor check about the people they take on for a job?
- AThat they hold a driving licence
- BThat they have the skills, knowledge, training and experienceAnswer
- CThat they live within a reasonable travelling distance of the site
- DThat they own their own tools
If a worker is still building those up, the contractor provides the training and supervision to cover the gap. Contractors also plan, manage and monitor their own work, including the risk to the public. On projects with more than one contractor they have to work to the construction phase plan.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/contractors.htm
- 32. Specialistcscs-156
Japanese knotweed is found on site. How must the cut material leave?
- AWith a registered waste carrier, to a licensed siteAnswer
- BIn the general skip
- CBurnt on a bonfire in the corner of the site
- DBuried anywhere on site
Knotweed grows back from small pieces of root and stem, so it is treated as controlled waste. It goes with a registered carrier to a site allowed to take it. Anything else risks spreading it to the next job.
Sourcehttps://www.gov.uk/guidance/prevent-japanese-knotweed-from-spreading
- 33. Specialistcscs-157
Why is burning not a safe way to get rid of Japanese knotweed?
- AThe crowns and roots can survive itAnswer
- BIt makes too much smoke
- CIt is slower than digging
- DIt needs a hot air blower
The part that regrows is underground. Fire deals with the stems you can see and leaves the crowns and rhizomes able to sprout again, which is why the guidance sends you to burying it properly or taking it off site.
Sourcehttps://www.gov.uk/guidance/prevent-japanese-knotweed-from-spreading
- 34. Specialistcscs-158
The plan is to bury knotweed material on site. What has to happen first?
- ATell the Environment Agency at least a month beforeAnswer
- BNothing, burial on site is free of rules
- CGet the client's agreement by word of mouth
- DWait for dry weather
Burial on site is allowed, but it is notified in advance and the notice is a month. It is not a decision the gang makes on the day.
Sourcehttps://www.gov.uk/guidance/prevent-japanese-knotweed-from-spreading
- 35. Specialistcscs-159
Bats are found roosting in a roof that is due to be stripped. What happens next?
- AWork stops until a licence is obtainedAnswer
- BCarry on, bats move by themselves
- CMove them to a box and continue
- DWork at night instead
Bats and their roosts are protected. If the work cannot avoid them it needs a licence, and that is arranged before the roof is touched, not after.
Sourcehttps://www.gov.uk/guidance/bats-protection-surveys-and-licences
- 36. Specialistcscs-160
A bird is nesting in scrub that is due to be cleared. What does the law expect first?
- AThat you try to avoid harming the birdsAnswer
- BThat you clear quickly to shorten the disturbance
- CThat you remove the nest carefully
- DThat you report it to the police
Avoiding harm comes first, before any measure that could kill or injure. In practice that usually means leaving that patch until the nest is empty and clearing the rest.
Sourcehttps://www.gov.uk/guidance/wild-birds-protection-surveys-and-licences
- 37. Specialistcscs-182
A badger sett lies in the line of a new access road. What does the law protect?
- AThe badgers but not the tunnels
- BThe sett only in the breeding season
- CNothing, because badgers are common
- DThe badgers and the sett itselfAnswer
Blocking the way in counts as damage, so a heap of spoil across an entrance is an offence on its own. Disturbing the animals inside is a separate offence, and so is letting a dog go down there.
Sourcehttps://www.gov.uk/guidance/badgers-protection-surveys-and-licences
- 38. Specialistcscs-183
Work on site cannot avoid interfering with a badger sett. Who can licence that?
- AThe principal contractor
- BThe Health and Safety Executive
- CNatural EnglandAnswer
- DThe local police force
The application has to show that everything else was tried first. On a development it needs expert help behind it, with a survey and a plan for reducing the harm. Hand tool work near a sett that will not disturb it usually needs no licence.
Sourcehttps://www.gov.uk/guidance/badgers-protection-surveys-and-licences
- 39. Specialistcscs-184
Great crested newts live in a pond beside the site. Besides the animals, what else does the law protect?
- ATheir eggs only, and only in spring
- BThe pond, but only if it is fenced off
- CNothing else is covered by the law
- DTheir eggs, breeding sites and resting placesAnswer
That takes in the land around the water, where these animals spend most of the year. Blocking the way to a place where they shelter counts as well, even when it happens through carelessness rather than on purpose.
Sourcehttps://www.gov.uk/guidance/great-crested-newts-protection-surveys-and-licences
- 40. Specialistcscs-185
What can someone face for each great crested newt offence they are convicted of?
- AA fixed fine of one hundred pounds
- BAn unlimited fine and up to 6 months in prisonAnswer
- CA caution from the local council
- DA written warning from the client
Each one is counted on its own, so an afternoon of clearance work can build a long list. Capturing, killing, injuring and disturbing all count, and so does damaging or destroying a place where the animals breed or shelter.
Sourcehttps://www.gov.uk/guidance/great-crested-newts-protection-surveys-and-licences
- 41. Specialistcscs-186
A tree on site is covered by a Tree Preservation Order. What is needed before anyone cuts it back?
- AA line in the site diary and nothing more
- BAgreement from the neighbouring householders
- CA permit from the Environment Agency
- DWritten consent from the local planning authorityAnswer
An Order bans cutting down, topping, lopping, uprooting and wilful damage or destruction. Cutting the roots counts too. Consent can come with conditions attached, and those conditions have to be followed.
Sourcehttps://www.gov.uk/guidance/tree-preservation-orders-and-trees-in-conservation-areas
- 42. Specialistcscs-187
A tree in a conservation area carries no Order of its own. How much notice does the council get before work on it?
- A24 hours
- B6 months
- C6 weeksAnswer
- DNo notice is needed
The notice goes in under section 211 of the Town and Country Planning Act 1990, and the wait gives the authority time to decide whether to protect the tree properly. Work can start sooner only where the authority has agreed.
Sourcehttps://www.gov.uk/guidance/tree-preservation-orders-and-trees-in-conservation-areas
- 43. Specialistcscs-208
On what ground can a council make a Tree Preservation Order?
- AThe tree is over a hundred years old
- BThe tree stands on council owned land
- CThe owner has asked for one in writing
- DIt is expedient in the interests of amenityAnswer
Amenity is about what the tree gives to the look and feel of the place, not about its age or its species. One Order can cover a single tree, a group of them or a whole woodland.
Sourcehttps://www.legislation.gov.uk/ukpga/1990/8/section/198
- 44. Specialistcscs-209
What does the Wildlife and Countryside Act say about planting listed plants in the wild?
- AIt is allowed with the landowner's consent
- BIt is an offenceAnswer
- CIt is encouraged as ground cover
- DIt is a matter for the council only
Causing such a plant to grow counts as much as planting it, which is what catches soil and cuttings carted off a job. Letting an animal that does not belong here loose is an offence under the same section.
Sourcehttps://www.legislation.gov.uk/ukpga/1981/69/section/14
- 45. Specialistcscs-234
Which trade has been identified as an at risk group for work related cancer?
- ASite security supervisors
- BQuantity surveyors
- CDelivery drivers
- DPainters and decoratorsAnswer
Research put around 250 deaths in one year among this group down to cancer of the lung, bladder and stomach. The figures rest on exposures going back decades, and paint has changed since, but the risk has not gone.
Sourcehttps://www.hse.gov.uk/construction/healthrisks/cancer-and-construction/painting.htm
- 46. Specialistcscs-235
Sanding down old paintwork before repainting can expose you to which of these?
- ALegionella
- BCarbon monoxide
- CLeadAnswer
- DLeptospirosis
The same work brings solvents, construction dust, asbestos and substances such as pigments, resins and catalysts. How much of it reaches you depends on the task, the method and how enclosed the space is.
Sourcehttps://www.hse.gov.uk/construction/healthrisks/cancer-and-construction/painting.htm
- 47. Specialistcscs-256
Who does a contractor have to co-ordinate with when planning health risks?
- AOnly the client's insurers
- BOnly the material suppliers
- CNobody, each firm works alone
- DWhoever else shares the siteAnswer
One firm's dust, noise or fumes reach everyone else working nearby, so a plan that stops at the edge of your own gang is not a plan. How detailed it needs to be depends on the work and the number of people employed.
Sourcehttps://www.hse.gov.uk/construction/healthrisks/managing-essentials/assess-the-risks.htm
- 48. Specialistcscs-257
Which of these is a recognised way of monitoring exposure at work?
- ACounting hours worked
- BWipe sampling of the skinAnswer
- CWeighing the worker
- DReading the tool serial number
Air sampling in the breathing zone or in the background, biological monitoring, and measuring noise or vibration levels are the others. Which one fits depends on how the substance or the hazard reaches the body.
Sourcehttps://www.hse.gov.uk/construction/healthrisks/managing-essentials/exposure-monitoring.htm
- 49. Specialistcscs-258
Block laying is planned for a job. What is the first thing to consider?
- AA bonus for laying more per day
- BA longer working day to finish sooner
- CA single worker to keep costs down
- DA method that avoids the handlingAnswer
A panel wall system, cluster laying or poured foundations remove the lifting instead of managing it. Where blocks stay, the lightest one that meets the design comes next, and thinner dense blocks laid flat beat thick ones on edge.
- 50. Specialistcscs-259
Which cancers carry the biggest share of the burden in construction?
- ASkin cancers from cement
- BStomach cancers from site food
- CLung cancers from asbestos and silicaAnswer
- DBone cancers from vibration
This industry carries the largest burden of any sector, over forty per cent of the deaths and registrations in the research. Diesel exhaust, painting work, sunlight and coal tar products account for a further significant share.
Sourcehttps://www.hse.gov.uk/construction/healthrisks/cancer-and-construction/key-points.htm
- 51. Specialistcscs-360
What counts as short duration work in the asbestos regulations?
- AAny job finished inside a single shift
- BOne person for under an hour in seven daysAnswer
- CAny job under a week from start to finish
- DOne person for under a day in seven days
The limit is counted in hours rather than in convenience: one person for under an hour in seven days, or several people adding up to under two hours across the same seven.
- 52. Specialistcscs-361
How often should refresher training for work with asbestos be given?
- AEvery yearAnswer
- BEvery three years
- CEvery five years
- DOnly once, at the start
Habits drift and the rules move on, so the guidance is every year for licensable and non-licensable work alike, set against a training needs analysis.
- 53. Specialistcscs-362
Does work on asbestos cement call for a licensed contractor?
- AYes, always, whatever the job
- BYes, unless the sheet is unbroken
- COnly where the roof is over two storeys
- DMostly no, given proper trainingAnswer
Cement holds its fibres far more tightly than board does, so mostly no, given proper training and instruction the work can go ahead without a licence.
- 54. Specialistcscs-363
Asbestos insulating board turns up in a building. What was it commonly put there for?
- ADamp proofing below ground level
- BSound deadening under floor screed
- CFire protection in walls and ceilingsAnswer
- DWeatherproofing of external brickwork
It was chosen for fire protection in walls and ceilings, which is why it shows up in partitions, bulkheads, ceiling tiles, lift shaft linings and soffits.
Sourcehttps://www.hse.gov.uk/asbestos/location-materials.htm
- 55. Specialistcscs-364
Who has to carry out the higher-risk work on asbestos?
- AAn HSE-licensed contractorAnswer
- BAny trained site operative
- CThe building owner in person
- DThe local authority surveyor
The more fibre a job releases the tighter the control, so it goes to an HSE-licensed contractor rather than to a trained general operative.
Sourcehttps://www.hse.gov.uk/asbestos/location-materials.htm
- 56. Specialistcscs-365
Which of these counts as lower-risk, non-licensed work on asbestos board?
- AStripping the board from a whole ceiling
- BClearing debris from a damaged panel
- CRemoving board that is in poor condition
- DRemoving a single ceiling tileAnswer
Small, contained jobs release very little, so removing a single ceiling tile sits on the non-licensed list, while whole ceilings and damaged board do not.
Sourcehttps://www.hse.gov.uk/asbestos/location-materials.htm
- 57. Specialistcscs-366
Roughly how many people in Great Britain die each year from asbestos-related disease?
- AAround 500
- BAround 5,000Answer
- CAround 50
- DAround 50,000
It is the largest single cause of work-related death in the country: around 5,000 every year, from diseases that take decades to show and cannot be cured.
- 58. Specialistcscs-367
Why can a worker breathe in asbestos without noticing anything at all?
- AThe fibres smell faintly of damp
- BThe fibres taste of chalk dust
- CThe fibres cannot be seen or smelledAnswer
- DThe fibres sting the eyes at once
There is no warning of any kind, because the fibres cannot be seen or smelled, on the air or on your clothes, so nothing tells you they are there.
- 59. Specialistcscs-368
Refurbishment is planned in an older building. Which asbestos survey is called for?
- AA management survey only
- BNo survey, just a register
- CA refurbishment and demolition surveyAnswer
- DA survey of the roof space only
A management survey covers normal occupation, but breaking into the fabric calls for a refurbishment and demolition survey, which goes looking for the hidden material first.
Sourcehttps://www.hse.gov.uk/asbestos/duty/arrange-asbestos-survey.htm
- 60. Specialistcscs-369
A tenant firm is asked for information by the person managing asbestos in the building. What does the law say?
- AThe request can be refused in writing
- BOnly the landlord need answer it
- CA fee may be charged for the answer
- DEveryone must cooperate with themAnswer
The duty cannot be discharged by one party working alone, so everyone must cooperate with them as far as is needed for it to be carried out.
Sourcehttps://www.legislation.gov.uk/uksi/2012/632/regulation/4
- 61. Specialistcscs-370
Exposure cannot be prevented on an asbestos job. Besides cutting exposure, what else does the law want?
- AThat the work runs only at night
- BThat as few people as possible are exposedAnswer
- CThat the client signs a waiver first
- DThat the fibres are counted each hour
Every extra body in the area is another set of lungs, so the law also wants that as few people as possible are exposed at any one time.
Sourcehttps://www.legislation.gov.uk/uksi/2012/632/regulation/11
- 62. Specialistcscs-371
Ground is being cleared and a half-built nest is found. What does the 1981 Act say?
- ABuilding work outranks a half-built nest
- BIt may be moved to a nearby bush
- CDamaging or destroying it is unlawfulAnswer
- DIt is protected only once eggs are laid
Protection starts before the eggs do, so damaging or destroying it is unlawful while a nest is in use or being built.
Sourcehttps://www.legislation.gov.uk/ukpga/1981/69/section/1
- 63. Specialistcscs-372
What does the 1981 Act say about the eggs of a wild bird?
- ATaking or destroying one is an offenceAnswer
- BThey may be moved to a safe place
- CThey are covered only in springtime
- DThey belong to the landowner
The egg is protected in its own right, so taking or destroying one is an offence quite apart from anything done to the bird or the nest.
Sourcehttps://www.legislation.gov.uk/ukpga/1981/69/section/1
- 64. Specialistcscs-373
A worker keeps a wild bird's egg found on site as a curiosity. Where does that stand?
- ALawful, as it was not taken from a nest
- BLawful, if it is handed in within a week
- CLawful, so long as it is not sold on
- DUnlawful unless lawfully takenAnswer
Possession is caught separately from taking, so holding an egg is unlawful unless lawfully taken and the holder can show as much.
Sourcehttps://www.legislation.gov.uk/ukpga/1981/69/section/1
- 65. Specialistcscs-374
A firm is charged with letting a listed plant spread into the wild. What defence does the Act allow?
- AThat the plant was already on the site
- BThat all reasonable steps were takenAnswer
- CThat the firm did not know the list
- DThat the ground was cleared in winter
Ignorance is not the test, effort is: the defence is that all reasonable steps were taken and all due diligence exercised to avoid the offence.
Sourcehttps://www.legislation.gov.uk/ukpga/1981/69/section/14
- 66. Specialistcscs-375
Besides planting, what else does section 14 of the 1981 Act make an offence?
- AFeeding wild deer on a building site
- BCutting a hedge in the summer months
- CReleasing a listed animal into the wildAnswer
- DDigging a pond without planning consent
The section covers arrivals as well as escapes, so releasing a listed animal into the wild is caught in the same way as putting a listed plant in the ground.
Sourcehttps://www.legislation.gov.uk/ukpga/1981/69/section/14
- 67. Specialistcscs-376
What does a Tree Preservation Order actually prohibit?
- ACutting down, lopping or uprooting the treeAnswer
- BPlanting anything within five metres of it
- CParking any vehicle beneath its branches
- DBuilding within the width of its canopy
The order bites on the tree itself, so cutting down, lopping or uprooting the tree is barred without consent, and so is wilful damage.
Sourcehttps://www.legislation.gov.uk/ukpga/1990/8/section/198
- 68. Specialistcscs-377
Woodland under an Order is felled by permitted forestry operations. What can the Order then require?
- AA payment to the local planning authority
- BA new Order over the neighbouring wood
- CA survey of the wildlife that was there
- DReplanting of the part that was felledAnswer
The point of the order is the amenity of the wood rather than one season of timber, so it can require replanting of the part that was felled.
Sourcehttps://www.legislation.gov.uk/ukpga/1990/8/section/198
- 69. Specialistcscs-378
What counts as a lifting operation under the 1998 lifting regulations?
- AAny move of a load across a site
- BRaising or lowering a loadAnswer
- CAny use of a crane or a hoist
- DAny load above one tonne in weight
Coming down is as dangerous as going up, so the definition covers raising or lowering a load, and both sit under the same duties.
Sourcehttps://www.legislation.gov.uk/uksi/1998/2307/regulation/8
- 70. Specialistcscs-379
How can edge protection reach a steel frame without anybody working at height to fit it?
- ABy throwing lines up from the ground
- BBy using a longer ladder each lift
- CBy fixing it before the steel is liftedAnswer
- DBy leaving it until the deck is down
The build sequence does the work a harness would otherwise do, so by fixing it before the steel is lifted the protection arrives already in place.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/steel-erection.htm
- 71. Specialistcscs-380
Which of these has to be set down in writing before it starts?
- ADismantling a structureAnswer
- BPouring a concrete slab
- CFitting a kitchen unit
- DPainting a stairwell
The danger lies in the order that things come apart, so dismantling a structure has its arrangements written down before anyone lays a hand on it.
Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/20
- 72. Specialistcscs-381
Besides firing them safely, what does CDM 2015 say about explosives on a site?
- AThey may be kept in the site office
- BThey must be logged with the council
- CThey must be counted at each shift end
- DThey must be stored and moved securelyAnswer
The danger starts long before a charge goes off, so they must be stored and moved securely as well as used safely.
Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/21
- 73. Specialistcscs-382
When does CDM 2015 call for practicable steps against a structure collapsing?
- AOnly where the structure is brand new
- BWhere the work leaves it weak or unstableAnswer
- COnly where the public can reach the site
- DWhere the structure is over three storeys
A building part-way through alteration is at its weakest, so the duty bites where the work leaves it weak or unstable, new structures and old alike.
Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/19
- 74. Specialistcscs-383
Hand tools are to be used near a badger sett without disturbing it. Is a licence needed?
- AYes, for any work within thirty metres
- BYes, whatever the tools being used
- CUsually not, if the sett is undisturbedAnswer
- DOnly where the sett is currently in use
The test is the effect on the animals rather than the distance, so usually not, if the sett is undisturbed and undamaged by what is going on nearby.
Sourcehttps://www.gov.uk/guidance/badgers-protection-surveys-and-licences
- 75. Specialistcscs-384
How long has a council got to confirm a Tree Preservation Order it has made?
- ASix months from the date of the OrderAnswer
- BSix weeks from the date of the Order
- CTwo years from the date of the Order
- DThere is no time limit on confirming
A provisional order cannot hang over a site indefinitely, so the window is six months from the date of the Order, after which a fresh one is needed.
Sourcehttps://www.gov.uk/guidance/tree-preservation-orders-and-trees-in-conservation-areas
- 76. Specialistcscs-396
Asbestos-containing articles are banned. Which of these can HSE exempt from that ban?
- AAnything a museum asks about
- BAnything made after 2005
- CAnything under a tonne in weight
- DArticles in service before 2005Answer
The relief is for what already existed rather than for anything new, so it reaches articles in service before 2005, on conditions HSE sets each time.
- 77. Specialistcscs-397
What does placing on the market mean where asbestos is concerned?
- ASupplying it, paid for or freeAnswer
- BSelling it for money only
- CAdvertising it in a catalogue
- DExporting it out of the country
The wording is deliberately wide, so supplying it, paid for or free, is caught, and so is bringing it into the country in the first place.
- 78. Specialistcscs-398
When must an employer put workers under health surveillance under COSHH?
- AWhenever more than five are employed
- BWhere it protects those exposedAnswer
- COnce a year in every workplace
- DOnly after somebody falls ill
The trigger is the substance and the job, not the headcount, so it applies where it protects those exposed or liable to be exposed to something harmful.
Sourcehttps://www.legislation.gov.uk/uksi/2002/2677/regulation/11
- 79. Specialistcscs-399
What makes health surveillance appropriate under COSHH?
- AA request from the workers themselves
- BA clause written into the contract
- CA listed substance and a listed processAnswer
- DA site with more than fifty workers
Schedule 6 pairs substances with the processes that make them dangerous, so a listed substance and a listed process together bring the duty into play.
Sourcehttps://www.legislation.gov.uk/uksi/2002/2677/regulation/11
- 80. Specialistcscs-400
Groundwork is going on where harmful micro-organisms may be present. What does HSE say about breaks?
- ATake them away from the work areaAnswer
- BTake them in the excavation itself
- CTake them only at the end of a shift
- DTake them with the gloves still on
Contamination travels on hands and clothing straight into food, so take them away from the work area, and wash hands and forearms before eating or drinking.
Sourcehttps://www.hse.gov.uk/construction/healthrisks/hazardous-substances/harmful-micro-organisms.htm
- 81. Specialistcscs-450
What does the law require before someone uses a cut-off saw or a grinder?
- AAdequate training in the method, the risks and the precautionsAnswer
- BA signature confirming they have read the machine handbook
- CFive years of experience with power tools of any kind
- DA medical certificate showing normal hearing and vision
Anyone who uses work equipment must have adequate training covering the methods that may be used, the risks that use may bring and the precautions to take. The same duty applies to the person supervising or managing that use. Reading the handbook and signing for it is not training, and length of service is not the test either.
Sourcehttps://www.legislation.gov.uk/uksi/1998/2306/regulation/9
- 82. Specialistcscs-451
Which measure comes first when guarding the dangerous parts of a machine?
- AA fixed guard enclosing the part, wherever that is practicableAnswer
- BA push-stick or jig to keep hands out of the danger zone
- CA written instruction telling operators to stand clear
- DA warning notice fixed to the body of the machine
The order runs downwards: fixed guards enclosing the dangerous part first, then other guards or protection devices, then jigs, holders and push-sticks with the necessary information, instruction, training and supervision. Each step is used only where the one above it cannot be done. Starting with a notice is starting at the bottom.
Sourcehttps://www.legislation.gov.uk/uksi/1998/2306/regulation/11
- 83. Specialistcscs-452
An operative finds the guard on a grinder awkward and ties it back out of the way. What is wrong with that?
- AA guard has to be hard to defeat, not easy to take offAnswer
- BNothing, provided the machine is used by one person only
- CNothing, as long as the guard is refitted before inspection
- DIt is only a problem on machines powered from the mains
The law lists what a guard has to be: suitable, well made of sound material and strong enough, kept in efficient working order and good repair, not creating a new risk, not easily bypassed or disabled, and far enough from the danger zone. Tying one back defeats the one measure that stands between a hand and a wheel turning at speed.
Sourcehttps://www.legislation.gov.uk/uksi/1998/2306/regulation/11
- 84. Specialistcscs-453
Who is allowed to change an abrasive wheel on a cutting machine?
- ASomebody trained for that job in particularAnswer
- BAnybody holding a valid card for the site
- CAny operative who has used the machine before
- DOnly an engineer employed by the manufacturer
Changing abrasive wheels is named as maintenance work with well established training schemes behind it, because mounting a wheel wrongly can burst it at full speed. Holding a site card is not the same as being trained for that task. The training can come from outside or from competent people in the firm, so long as it is done properly.
Sourcehttps://www.hse.gov.uk/work-equipment-machinery/maintenance.htm
- 85. Specialistcscs-454
Cutting paving slabs with a disc cutter throws up a cloud of fine dust. How serious is that dust?
- AIt is the biggest risk to construction workers after asbestosAnswer
- BIt is a nuisance on the job but carries no health risk at all
- CIt only matters if the dust gets into the eyes of the operator
- DIt only matters when the cutting work is carried out indoors
Concrete, brick, stone and mortar all contain silica, and cutting them dry releases particles fine enough to reach deep into the lungs. Long exposure causes silicosis, chronic obstructive lung disease and lung cancer, and the amounts needed are not large. The damage builds over years, which is why one dusty afternoon feels harmless. Water suppression, on-tool extraction and a properly fitted mask are the controls, in that order.
Sourcehttps://www.hse.gov.uk/construction/healthrisks/cancer-and-construction/silica-dust.htm
- 86. Specialistcscs-455
Who else besides the operator needs training on work equipment such as a grinder?
- AAnyone who supervises or manages its useAnswer
- BOnly the person who bought the machine
- COnly the site first aider on that shift
- DNobody else, as long as the operator is trained
The duty covers both the user and anyone supervising or managing the use, and the content is the same: the methods, the risks and the precautions. A supervisor who cannot recognise a wrong wheel or a missing guard cannot stop the job, which is the whole point of having one on the deck.
Sourcehttps://www.legislation.gov.uk/uksi/1998/2306/regulation/9