CITB ยท Health, safety and environment test for operatives
Safety
80 questions in this part of the Health and Safety Test (CSCS) bank. Every answer below is the one the bank holds, and the document under each question is where it was written from. They are written from those documents; they are not the questions of the real test, which are not published.
Practise the whole bank in the browserThe same bank as an Android app, on Google Play
All 80 questions
- 1. Safetycscs-154
Fuel from a site tank has run into a stream. What kind of problem is this?
- AWater pollution, and it is reportedAnswer
- BOnly a cost problem for the fuel
- CA matter for the client alone
- DNothing, if the stream is small
A spill that reaches a river, stream or canal is water pollution and it is reported. Stop the source if it is safe to do so, contain what you can, then report it. Water carries it far beyond the site.
- 2. Safetycscs-161
Who is legally responsible for an oil storage container on a site?
- AThe person in control of the premisesAnswer
- BThe fuel supplier
- CThe driver who last filled it
- DNobody, until it leaks
Responsibility sits with whoever is responsible for the property or premises. On a site that is normally the site manager, and it does not pass to the delivery driver.
- 3. Safetycscs-162
From what size does an oil storage container fall under the rules for businesses?
- A3,501 litres or moreAnswer
- B500 litres or more
- C1,000 litres or more
- D10,000 litres or more
Below that figure the rules for homes apply, at and above it the rules for businesses do. Site tanks are usually well over it, so the business rules are the ones to expect.
- 4. Safetycscs-164
Rubbish and fallen material have blocked a river running past the site. What should be done?
- AReport the blockageAnswer
- BClear it with the excavator
- CLeave it, rivers clear themselves
- DDivert the water around it
A blocked watercourse is reported rather than cleared by whoever is nearest. Pulling material out with plant can make flooding worse and can damage the bank and what lives in it.
- 5. Safetycscs-165
What colour should a manhole cover be painted if the drain under it takes surface water?
- ARed
- BGreen
- CBlueAnswer
- DYellow
Surface water drains run straight out to a river or a soakaway, so nothing but clean water may go down them. Foul water covers are painted red, and a combined system carries a red C. A painted arrow shows which way the flow goes.
Sourcehttps://www.gov.uk/guidance/pollution-prevention-for-businesses
- 6. Safetycscs-166
A diesel tank holding more than 205 litres stands on site. How much must the bund around it hold?
- AAt least 25% of the container's capacity
- BThe same as the container capacity
- CHalf of the container capacity
- DAt least 110% of the container capacityAnswer
Secondary containment has to take the whole contents and then some, because a tank fails when it is full. Containers up to 205 litres get at least a quarter of their capacity. Nothing else may be stored in a bund, and rainwater has to be taken out.
Sourcehttps://www.gov.uk/guidance/pollution-prevention-for-businesses
- 7. Safetycscs-167
Where should spill kits be kept on a site that stores fuel and chemicals?
- AIn the site office next to the first aid kit box
- BIn the site manager's vehicle at all times
- CNear storage, loading areas and transfer routesAnswer
- DAt the main gate, where deliveries book in
A kit five minutes away is no use in the first minute, and the first minute decides how far the spill travels. The kit also has to suit what is stored. Anyone supervising a delivery needs to know where it is and how to use it safely.
Sourcehttps://www.gov.uk/guidance/pollution-prevention-for-businesses
- 8. Safetycscs-168
A site runs an activity that needs an environmental permit, but nobody applied for one. What is the position?
- AThey have three months to apply
- BIt is allowed while the work is short
- CIt is allowed if nothing is spilled
- DThey are breaking the lawAnswer
The permit is what sets the conditions the activity has to meet, so working without one leaves the controls unwritten and unchecked. How long the job lasts makes no difference. Advice can be had from the Environment Agency before applying.
Sourcehttps://www.gov.uk/environmental-permit-check-if-you-need-one
- 9. Safetycscs-169
Polluting liquid is to be let into a stream running past the site. What is needed first?
- AA note in the site diary
- BAn environmental permit for the dischargeAnswer
- CNothing, if the stream is small
- DPermission from the site manager
Rivers and streams count as surface water, and letting polluting liquid into them is an activity in its own right. Releasing it into the ground so that it reaches water underground is treated the same way. Both are run by the Environment Agency.
Sourcehttps://www.gov.uk/environmental-permit-check-if-you-need-one
- 10. Safetycscs-170
Work is planned in the flood plain of a main river. What may be needed before it starts?
- AA written record kept in the site diary only
- BA waste transfer note from the carrier
- CA noise abatement notice from the council
- DAn environmental permit for flood risk activitiesAnswer
The same goes for work in, under, over or near the river itself, including where it runs in a culvert, and for work on or near a sea defence on a main river. Permits of this kind are managed by the Environment Agency.
Sourcehttps://www.gov.uk/environmental-permit-check-if-you-need-one
- 11. Safetycscs-171
Under the Environmental Protection Act 1990, how must controlled waste be kept?
- AUnder cover at all times, whatever it is
- BFor no longer than seven days after it arrives
- CNot in a way likely to pollute or harm healthAnswer
- DOnly in metal containers with fitted lids
The wording covers treating, keeping and disposing of waste, so a badly run skip area is enough on its own. Tipping waste on land without an environmental permit is a separate offence in the same section of the Act.
Sourcehttps://www.legislation.gov.uk/ukpga/1990/43/section/33
- 12. Safetycscs-172
Dust drifts off a site onto the houses next door. In law, what can that amount to?
- AA statutory nuisanceAnswer
- BA reportable dangerous occurrence
- CA breach of the waste transfer rules
- DA matter only for the site insurer
The same list in the Act covers smoke, fumes, smell and steam arising on business premises. A council has to look into a complaint from anyone living in its area, and to act on whoever is responsible once it agrees there is a problem.
Sourcehttps://www.legislation.gov.uk/ukpga/1990/43/section/79
- 13. Safetycscs-173
Site floodlights shine into bedroom windows across the road all night. Where does that stand in the Act?
- AOnly daytime glare is covered
- BIt is a matter for the planning authority only
- CArtificial light from premises is coveredAnswer
- DLighting is not covered at all
Light from premises sits in the same list as smoke, fumes, dust and noise. The test is the same too: harm to health, or unreasonable interference with the use of a home. Aiming lamps down and away from housing is the usual answer.
Sourcehttps://www.legislation.gov.uk/ukpga/1990/43/section/79
- 14. Safetycscs-174
A council serves a notice on a site under the Control of Pollution Act 1974. What can that notice set?
- AThe number of workers allowed on site
- BThe price the contractor may charge
- CThe order in which the trades attend
- DThe hours during which the works may be carried outAnswer
It can also name the plant or machinery that may or may not be used, and set a level of noise for the premises. Before deciding, the council has to think about whether the best practicable means are being used to keep noise down.
Sourcehttps://www.legislation.gov.uk/ukpga/1974/40/section/60
- 15. Safetycscs-175
Which of these jobs falls under the construction noise section of the Control of Pollution Act 1974?
- ADelivery driving to the site gate
- BOffice work in the site cabin
- CDemolition or dredging workAnswer
- DSelling materials from a builders yard
The section also reaches erecting, altering, repairing and maintaining buildings, structures and roads, breaking up or boring under a road, and any work of engineering construction. That is most of what makes noise on a job.
Sourcehttps://www.legislation.gov.uk/ukpga/1974/40/section/60
- 16. Safetycscs-210
For site noise to count as a statutory nuisance, what does it have to do?
- ABe louder than a passing lorry
- BLast for a full working week
- CBe heard from more than a mile away
- DSubstantially interfere with the use of a homeAnswer
The other route is injuring health, or being likely to. A council has to look into the complaint, and where it agrees it must serve a notice telling whoever is responsible to stop the noise or hold it down.
Sourcehttps://www.gov.uk/guidance/noise-nuisances-how-councils-deal-with-complaints
- 17. Safetycscs-211
A contractor wants certainty about noise before a job starts. What can be applied for?
- AA licence issued by the Health and Safety Executive
- BA waiver from the Environment Agency
- CConsent from the council to carry out the workAnswer
- DAn exemption from the building control body
The application has to describe the works, how they will be done and what will keep the noise down. Where the council is satisfied and would not have needed to serve a notice anyway, it has to agree.
Sourcehttps://www.gov.uk/guidance/noise-nuisances-how-councils-deal-with-complaints
- 18. Safetycscs-212
A site ignores a council notice about construction noise. What can follow?
- AAn unlimited fine, with more for each dayAnswer
- BA one off charge of fifty pounds
- CA warning letter and nothing else
- DA note kept on the planning file
The daily part is what bites, because it turns one penalty into a running cost for as long as the breach lasts. Doing what the notice sets out is always cheaper than arguing about it afterwards.
Sourcehttps://www.gov.uk/guidance/noise-nuisances-how-councils-deal-with-complaints
- 19. Safetycscs-229
Who has to be trained before using a piece of work equipment?
- AOnly apprentices under twenty one
- BOnly the person who owns it
- CEveryone who uses itAnswer
- DOnly workers on their first week
The training covers the methods that may be used, the risks that come with the use and the precautions to take. Anyone who supervises or manages the use of the equipment has to be trained as well.
Sourcehttps://www.legislation.gov.uk/uksi/1998/2306/regulation/9
- 20. Safetycscs-230
What is the first measure the law asks for against a dangerous part of a machine?
- AA warning sticker fixed on the casing
- BA briefing before each shift
- CGloves for the operator
- DA fixed guard enclosing the partAnswer
Where enclosing it is not practicable, other guards or protection devices come next, then jigs, holders and push sticks with the information and training to match. Guards must not be easy to bypass or disable.
Sourcehttps://www.legislation.gov.uk/uksi/1998/2306/regulation/11
- 21. Safetycscs-231
When does the law allow work on or near a live conductor?
- AWhenever the job would take much longer otherwise
- BWhenever the worker feels confident
- COnly when it is unreasonable for it to be deadAnswer
- DWhenever rubber gloves are available
Two more conditions come with it: that it is reasonable for the person to be working there live, and that suitable precautions are taken to prevent injury. All three have to be met, not one of the three.
Sourcehttps://www.legislation.gov.uk/uksi/1989/635/regulation/14
- 22. Safetycscs-232
What does the law demand of protective equipment issued for electrical work?
- AIt is stored in a locked cabinet
- BIt is replaced every twelve months
- CIt is marked with the owner's name
- DIt is suitable, maintained and properly usedAnswer
All three matter together. Suitable gear kept badly is no protection, and gear in good order used the wrong way is none either. The same regulation requires electrical systems themselves to be built and kept to prevent danger.
Sourcehttps://www.legislation.gov.uk/uksi/1989/635/regulation/4
- 23. Safetycscs-233
What must a loading bay on a site have?
- AA roof over the whole area
- BAt least one exit only for pedestriansAnswer
- CA weighbridge at the entrance
- DA supervisor present at all times
Traffic routes also have to keep enough space between vehicles and people, and doors onto a route must be set back far enough for someone to see plant coming from a place of safety. Routes are signed, checked and maintained.
Sourcehttps://www.legislation.gov.uk/uksi/2015/51/regulation/27
- 24. Safetycscs-253
An area is at or above the upper exposure action value for noise. What must the employer do with it?
- AClose it to all work until it is quieter
- BSound a warning horn every hour
- CMake it a marked Hearing Protection ZoneAnswer
- DRecord the noise level in the site diary each day
The zone is marked with the sign for ear protection, access to it is restricted where that is practicable, and nobody should be in there without protectors on. Hearing protection is also made available on request at the lower value.
Sourcehttps://www.legislation.gov.uk/uksi/2005/1643/regulation/7
- 25. Safetycscs-254
What must workers exposed to noise be told about, besides the risks?
- AThe cost of the protectors provided
- BThe names of the neighbours complaining
- CThe make of every tool on the site
- DHow to spot and report signs of hearing damageAnswer
The list also covers the action and limit values, what the risk assessment found, why the controls are what they are, how to use the protectors correctly, and the entitlement to health surveillance.
Sourcehttps://www.legislation.gov.uk/uksi/2005/1643/regulation/10
- 26. Safetycscs-255
Which measure is left out of the programme a firm must run when noise is above the upper action value?
- AChoosing quieter work equipment
- BChanging the working method
- CHanding out hearing protectorsAnswer
- DMaintaining the equipment properly
The programme is about cutting the noise itself, by method, equipment, layout, maintenance and training. Protectors are dealt with separately, because a firm that reaches for them first has not reduced anything.
Sourcehttps://www.legislation.gov.uk/uksi/2005/1643/regulation/6
- 27. Safetycscs-260
CDM 2015 sums up its aim in one line about risk. What is that line?
- APlan the work so risks are managed from start to finishAnswer
- BRecord every risk in a folder kept in the site office
- CMove all the risk onto the firm that signs the contract
- DAssess the risk once at the start and leave it alone
CDM is built around planning: the point is to plan the work so risks are managed from start to finish, not to meet them as they arrive. A folder of records is evidence that planning happened, never a substitute for it.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/overview.htm
- 28. Safetycscs-261
What does CDM 2015 expect a project to do with its workers about risk?
- ATest them on the risks at the end of each week
- BConsult and engage with them about the risksAnswer
- CAsk them to sign that they accept the risks
- DSend them the risk assessment by email only
The regulations treat workers as a source of knowledge rather than an audience, so the duty is to consult and engage with them about the risks and how they are managed. A signature accepts nothing and changes nothing on the ground.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/overview.htm
- 29. Safetycscs-262
How many kinds of client does CDM 2015 recognise?
- AThree: public, private and domestic clients
- BOne: whoever signs the building contract
- CTwo: paying clients and unpaid clients
- DTwo: commercial clients and domestic clientsAnswer
The split matters because the duties differ. CDM knows two: commercial clients and domestic clients, and only the commercial kind carries the client duties in full.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/responsibilities.htm
- 30. Safetycscs-263
Under CDM 2015 what is a designer's main duty?
- ATo eliminate, reduce or control foreseeable risksAnswer
- BTo sign off the contractor's method statements
- CTo supervise the work while it is being built
- DTo keep the drawings safe until handover day
A decision made on paper can remove a hazard before anyone is ever exposed to it, which is why the duty is to eliminate, reduce or control foreseeable risks rather than to police the site afterwards.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/responsibilities.htm
- 31. Safetycscs-264
When does a client have to appoint a principal contractor?
- AOn any job lasting longer than one week
- BWhere more than one contractor is involvedAnswer
- COn every project, however small the work
- DOnly where the work has to be notified
One firm has to hold the construction phase together, and the trigger is where more than one contractor is involved. Where a single firm does the lot, that firm carries the duties itself.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/responsibilities.htm
- 32. Safetycscs-265
A commercial client is settling the arrangements for a project. Besides appointing people, what must those arrangements secure?
- AThe cheapest tender is always accepted
- BThe programme is fixed before design
- CSufficient time and resources are allocatedAnswer
- DA bonus is offered for an early finish
Most of the risk on a site is decided by the programme and the budget long before anyone digs, so the arrangements have to make sure sufficient time and resources are allocated. Squeezing either simply passes the danger down the chain.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/summary.htm
- 33. Safetycscs-266
Who can hold the role of principal designer?
- AAny architect on the job, by default
- BThe client's health and safety adviser
- CThe first contractor to reach the site
- DA designer the client appoints to itAnswer
The role belongs to design rather than to administration, so it falls to a designer the client appoints to it, with enough knowledge, experience and ability to do the job.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/summary.htm
- 34. Safetycscs-267
On which of these grounds does construction work have to be notified to HSE?
- AMore than 30 days with over 20 workers at onceAnswer
- BMore than 10 days with over 10 workers at once
- CAny job where a crane stands on site a week
- DAny job on a building taller than three floors
Notification follows the size of the job, not the trade doing it. The line is more than 30 days with over 20 workers at once, so a short job with a big gang can stay the right side of it.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/buildingcontrol.htm
- 35. Safetycscs-268
Besides the day and worker counts, what other figure makes a project notifiable?
- AA contract value above one million pounds
- BMore than 500 person days of building workAnswer
- CMore than 50 deliveries in any single week
- DA site area larger than a hectare in total
The second test catches long jobs run by small gangs: work of more than 500 person days of building work counts even when fewer than twenty people are ever there together.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/buildingcontrol.htm
- 36. Safetycscs-269
A project has been notified to HSE. What has to happen to the notification itself?
- AA copy goes to the local council as well
- BIt is posted to every worker before they start
- CIt stays sealed until the job is finished
- DA copy is displayed in the site officeAnswer
Notification is meant to be visible to the people it concerns, so a copy is displayed in the site office instead of being filed away at head office.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/commercial-clients.htm
- 37. Safetycscs-270
Who must the client hand the pre-construction information to?
- AOnly the principal contractor, once appointed
- BOnly the firms that win a place on the job
- CEvery designer and contractor bidding or appointedAnswer
- DOnly the designers, who pass it on later
A firm cannot price a risk nobody told it about, so the information goes to every designer and contractor bidding or appointed, and not just to the winners once the tender is settled.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/commercial-clients.htm
- 38. Safetycscs-271
Who draws up the health and safety file, and who makes sure it gets done?
- AThe principal designer draws it, the client checksAnswer
- BThe client writes it, the council checks it later
- CThe principal contractor writes it at handover
- DThe building inspector draws it after signoff
The file follows the design knowledge, so the principal designer draws it, the client checks that it is done, revised and passed to whoever needs it for later work on the building.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/commercial-clients.htm
- 39. Safetycscs-272
Several firms are working on a family home. Where do the client duties end up?
- AThey stay with the householder in every case
- BThe principal contractor takes them onAnswer
- CThe local building inspector takes them on
- DThey are shared equally between the firms
A householder is not expected to run a building project, so on a job with more than one firm the principal contractor takes them on alongside its own duties.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/domestic-clients.htm
- 40. Safetycscs-273
A householder wants the architect to carry the client duties instead. What does that take?
- AA note in the minutes of the first site meeting
- BA spoken agreement in front of two witnesses
- CA letter sent to HSE before work can start
- DA written agreement with the householderAnswer
Duties cannot be moved by assumption, which is why the law asks for a written agreement with the householder. Without one they fall to the principal contractor whatever anybody intended.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/domestic-clients.htm
- 41. Safetycscs-274
Which phase of a project does the principal designer look after?
- AThe pre-construction phaseAnswer
- BThe whole of the build itself
- CThe first month of work on site
- DThe year after the building opens
Most design is settled before anyone reaches the site, which is why the role covers the pre-construction phase, planning and coordinating health and safety while the decisions are still on paper.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/principal-designers.htm
- 42. Safetycscs-275
What does the principal designer owe the principal contractor while a job runs?
- AA monthly invoice for design changes made
- BA copy of every drawing issued to date
- CWord of any risks to control on siteAnswer
- DA signature on the site induction sheet
The two roles overlap in time, and the traffic worth having between them is word of any risks to control on site, so a hazard spotted at the drawing board is not rediscovered by a gang standing under it.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/principal-designers.htm
- 43. Safetycscs-276
A designer is asked to start work for a client who has never built anything. What comes first?
- ASending the drawings to the council for a check
- BBooking a site induction with the contractor
- CAsking the client to sign a waiver of duties
- DMaking sure the client knows their CDM dutiesAnswer
A client who does not know the duties exist cannot carry them, so the job starts with making sure the client knows their CDM duties, before a line of design is drawn.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/designers.htm
- 44. Safetycscs-277
A bricklayer alters a detail on site to make the work easier. What does that make them?
- AA contractor acting outside their trade
- BA designer for that piece of the workAnswer
- CA principal contractor for that element
- DA client for the part they have altered
The role follows the act, not the job title. Anyone who gets actively involved in design becomes a designer for that piece of the work, tradespeople included, and picks up the duties that go with it.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/designers.htm
- 45. Safetycscs-278
By when must the written construction phase plan exist?
- AWithin the first week of work on site
- BOnce the first accident is reported
- CBefore the construction phase beginsAnswer
- DBefore the building is handed over
A plan written after work starts has already missed the decisions it was meant to shape, so it has to be there before the construction phase begins and then be kept under review.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/principal-contractors.htm
- 46. Safetycscs-279
What does CDM 2015 ask of a principal contractor about people who have no business being there?
- ATake steps to prevent unauthorised accessAnswer
- BReport every trespasser to the police
- CFit cameras covering the whole boundary
- DWarn the neighbours in writing each month
Children and passers-by are hurt on sites they were never meant to reach, so the duty is to take steps to prevent unauthorised access rather than to react once somebody is already inside.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/principal-contractors.htm
- 47. Safetycscs-280
What must every worker be given before starting on a job run by a principal contractor?
- AA copy of the full construction phase plan
- BA trade test set by the principal contractor
- CA written contract of employment
- DAn induction for that particular siteAnswer
Hazards differ from one site to the next, so a general safety course does not reach them. What the law asks for is an induction for that particular site, plus whatever further training the work needs.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/principal-contractors.htm
- 48. Safetycscs-281
One firm is doing the whole job on its own. Who draws up the construction phase plan?
- AThe client, before letting the contract
- BNobody, a lone firm is exempt from it
- CThe contractor doing the work itselfAnswer
- DThe council, as part of building control
The duty follows the work, not the number of firms on the job. Where there is only one, the contractor doing the work itself draws the plan, exactly as a principal contractor would on a larger project.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/planning.htm
- 49. Safetycscs-282
A subcontractor disagrees with a safety instruction from the principal contractor. What does CDM say?
- AThe instruction can be ignored if unreasonable
- BThe client settles the disagreement in writing
- CThe subcontractor must comply with the directionAnswer
- DThe instruction binds directly employed staff only
Coordination collapses if every firm keeps its own rules, so the subcontractor must comply with the direction and take the disagreement up separately rather than on the spot.
Sourcehttps://www.hse.gov.uk/construction/cdm/2015/contractors.htm
- 50. Safetycscs-283
What has the construction phase plan got to set out?
- AArrangements, site rules and Schedule 3 risksAnswer
- BThe tender price broken down by trade
- CThe names of everyone on the payroll
- DThe delivery dates for all materials
It is a working document about danger, not about money, so it covers arrangements, site rules and Schedule 3 risks, the short list that includes drowning, asbestos and work near live power lines.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/planning.htm
- 51. Safetycscs-284
From what size of workforce must the significant findings of a risk assessment be written down?
- ATwo or more people employed
- BFive or more people employedAnswer
- CTen or more people employed
- DTwenty or more people employed
Small firms still have to assess, but the written record starts at five or more people employed. Below that the assessment is owed all the same, only the paperwork is not.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/admin.htm
- 52. Safetycscs-55
A worker takes the guard off a bench saw because it slows the job down. Which law does that break?
- ANone, guards are advisory
- BThe duty not to interfere with safety equipmentAnswer
- COnly the site rules, not the law
- DThe duty to wear protective equipment
The Health and Safety at Work etc. Act 1974 makes it an offence for anyone to interfere with or misuse something provided for safety. It covers guards, barriers, signs, alarms and fire kit. Wedging a fire door open falls under the same words.
Sourcehttps://www.legislation.gov.uk/ukpga/1974/37/section/8
- 53. Safetycscs-56
Your employer gives you protective equipment the law requires, then wants to take the cost out of your pay. What does the law say?
- ANo charge may be made for itAnswer
- BA charge is allowed if you agree in writing
- CA charge is allowed if you leave within a year
- DA charge is allowed if you lose the item
The Act bars the charge outright and also bars letting someone else levy it, so an agency cannot do it on the employer's behalf. Signing a form does not make it lawful. If money is coming off your wages for kit the law demands, question it.
Sourcehttps://www.legislation.gov.uk/ukpga/1974/37/section/9
- 54. Safetycscs-57
You are given a respirator and shown how to wear it. What do the Personal Protective Equipment at Work Regulations 1992 require of you?
- ATo buy your own replacement filters
- BTo use it the way you were trained toAnswer
- CTo keep it in your own vehicle
- DTo test it yourself once a month
The duty is to use the kit in line with the training and the instructions you were given, not just to have it on you. Kit worn wrongly gives you the feeling of protection and none of the fact. If the training did not happen, say so.
Sourcehttps://www.legislation.gov.uk/uksi/1992/2966/regulation/10
- 55. Safetycscs-58
What must you do with issued protective equipment at the end of a shift?
- ALeave it wherever the job finished
- BHand it to the next shift
- CReturn it to the place provided for itAnswer
- DTake it home to keep it clean
There has to be somewhere to keep it, and you have to take reasonable steps to put it back there. Kit left in the dust gets damaged, and damaged kit does not protect. Storing it properly is part of it working next time.
Sourcehttps://www.legislation.gov.uk/uksi/1992/2966/regulation/10
- 56. Safetycscs-59
Why are 110 volt tools preferred to 230 volt tools on site?
- AThey are lighter to carry
- BThe voltage to earth stays below 55 voltsAnswer
- CThey run for longer on one charge
- DThey cannot be damaged by water
A centre tapped to earth supply halves what reaches you if something goes wrong, so a fault is far less likely to kill. Cordless tools are better again. Tools bought for home use are not built for site conditions.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/systems.htm
- 57. Safetycscs-60
What does a residual current device do?
- AIt smooths the voltage to the tool
- BIt stops the tool overheating
- CIt detects some faults and cuts the supply fastAnswer
- DIt shows how much power a tool uses
It watches for certain faults and switches off quickly, which can be the difference between a shock and a death. It does not catch every fault, so it is a backup rather than a licence to relax. It has to be checked daily and kept out of the wet and the dirt.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/systems.htm
- 58. Safetycscs-61
How often should 230 volt equipment on site be looked over for damage?
- AEvery shiftAnswer
- BOnce a month
- COnce a year
- DOnly when it stops working
A quick look each shift catches the cut lead and the cracked plug before they catch you. On top of that comes a proper visual inspection each week and a combined inspection and test each month. Keeping the records makes the pattern visible.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/systems.htm
- 59. Safetycscs-62
You are hand digging close to a buried electric cable. What kind of tools should you use?
- AInsulated toolsAnswer
- BThe heaviest pick available
- CA mechanical breaker
- DAny steel tool, used slowly
A sharp point through a cable causes an arc, and the flash burns hands and face. Insulated hand tools reduce that risk when you are working right next to the service. Nothing about digging slowly makes a steel spike safe.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/underground.htm
- 60. Safetycscs-63
What is the safe way to uncover a buried service by hand?
- ADig straight down on top of it
- BDig alongside it, not directly aboveAnswer
- CDig from both ends at the same time
- DPull it clear once the top is exposed
Working from the side and then exposing it horizontally lets you control the force on the tool. Digging down onto a service is how they get struck. Trial holes confirm the position that the locator gave you.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/underground.htm
- 61. Safetycscs-64
The utility drawings show a cable running along the far side of the plot. Is that enough to start digging?
- AYes, the drawings are accurate to the metre
- BYes, if the drawings are less than a year old
- CNo, cables must also be traced and markedAnswer
- DNo, digging near cables is never allowed
Plans only give an indication of where services run and how many there are. A locator has to find the line on the ground, and the marks go on before anyone digs. Locators are used again and again as the work moves.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/underground.htm
- 62. Safetycscs-65
A scaffold tube is being carried under an overhead power line without touching it. Why is that still dangerous?
- AThe line may swing in the wind
- BElectricity can jump the gapAnswer
- CThe tube may bend under its own weight
- DThe line could be cut by the tube
Coming close to a live conductor can cause a flashover, so touching it is not needed to be killed. Long items like tubes, ladders and tipper bodies are what bridge the gap. The owner of the line is the one who tells you the safe clearance.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/overhead.htm
- 63. Safetycscs-66
Nobody on site knows whether the overhead lines crossing the plot are switched off. What should you assume?
- AThat they are dead until told otherwise
- BThat they are live until the owner proves otherwiseAnswer
- CThat old lines are always dead
- DThat lines on wooden poles are dead
Only the owner of the line can say it is dead, and until they do you treat it as live. That means talking to them early, because diverting or isolating a line takes time. Guessing is what kills people on this job.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/overhead.htm
- 64. Safetycscs-67
Thin cables on wooden poles run across the corner of the site. What is the risk?
- AThey may be power lines, not telephone wiresAnswer
- BWooden poles rot and fall over
- CThey interfere with site radios
- DThey are always safe to work near
Power lines on wooden poles get mistaken for telephone wires all the time, and the mistake is fatal. Current can also pass through damp or dirty wood and plastic. Treat every overhead line as live until the owner says different.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/overhead.htm
- 65. Safetycscs-68
Under the fire safety law for construction sites, who is normally the responsible person?
- AThe fire and rescue service for the area
- BThe main or principal contractor in controlAnswer
- CThe most senior worker on site that day
- DThe person who owns the land
Control of the site is what decides it, and that is usually the main or principal contractor. They have to carry out a fire risk assessment and keep it up to date. A duty that moved with the day shift would belong to nobody.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/generalfire.htm
- 66. Safetycscs-69
Which extinguisher suits a fire in flammable liquids?
- AWater
- BDry powder or foamAnswer
- CA fire blanket only
- DSand from the site heap
Water spreads a liquid fire instead of putting it out. Powder or foam is the right choice, and carbon dioxide is for electrical fires. Extinguishers sit at marked fire points and the people expected to use them are trained first.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/generalfire.htm
- 67. Safetycscs-70
What matters most about the fire warning system on a site?
- AThat it is mains powered
- BThat it is heard above the site noiseAnswer
- CThat it is fitted at the site office
- DThat it sounds different each week
A warning nobody hears is not a warning. It has to stand out from the machines, be recognised by everyone and reach the whole site. On a small job an air horn or a whistle can do it; on a big one it will be a proper alarm that gets tested.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/generalfire.htm
- 68. Safetycscs-71
What precautions go with hot work such as cutting or welding?
- AClear the area, have extinguishers, keep watchAnswer
- BWork only in the last hour of the day
- CKeep a bucket of water within reach
- DTell the site office when you have finished
Sparks travel and they can smoulder for a long time after the tool is off, which is why somebody keeps watching. Clearing combustible material first removes most of the fuel. On bigger jobs a permit to work controls when and where it happens.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/processfire.htm
- 69. Safetycscs-72
Someone suggests burning the timber offcuts in the corner of the site. What is the position?
- AFine, if it is done before eight in the morning
- BFine, if a person stands by with a hose
- CBonfires should not normally be allowedAnswer
- DFine, as long as the wood is untreated
Site fires get out of hand and the smoke reaches the neighbours as well. Waste has to be taken away properly instead. Keeping the site clear of rubbish also stops arson, which is a real cause of site fires.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/processfire.htm
- 70. Safetycscs-73
Which vehicle movement causes most of the deaths on site and should be avoided where possible?
- AReversingAnswer
- BTurning left
- CDriving up a slope
- DBraking on gravel
The driver cannot see behind, and people walk into that blind area. A one way system or a turning circle takes the reverse out of the job. Where reversing cannot be avoided, mirrors, cameras and a trained marshaller are all that is left between the driver and someone behind him.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/vehiclestrafficmanagement.htm
- 71. Safetycscs-74
What is the best way to stop people being struck at a busy site entrance?
- AAsk drivers to sound the horn
- BHave separate gates for people and vehiclesAnswer
- CSet a speed limit at the gate
- DPut a mirror on the gatepost
Keeping the two apart is the control that does not depend on anyone paying attention. Walkways should be firm, drained and direct, and crossings should be lit and signed. Most transport accidents on site come from failing to separate them.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/vehiclestrafficmanagement.htm
- 72. Safetycscs-75
What should people on foot wear where site vehicles are working?
- ADark clothing that hides dirt
- BHigh visibility clothingAnswer
- CA coloured armband
- DWhatever their employer supplies
The driver has seconds and a poor view, so being seen early is what saves you. Lighting on shared routes does the same job after dark or in bad weather. Being visible does not replace staying on the walkway.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/vehiclestrafficmanagement.htm
- 73. Safetycscs-76
What kills most of the drivers who die in dumper accidents?
- AThe vehicle overturningAnswer
- BFire in the engine bay
- CFalling from the step
- DContact with an overhead line
More than six in ten dumper deaths are drivers crushed when the machine goes over. Most of the rest are people on foot struck by a moving dumper. Slopes, stockpiles and unprotected edges are where it happens.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/dumpers.htm
- 74. Safetycscs-77
What two things must be in place to protect a dumper driver if the machine tips?
- AA helmet and a warning beacon
- BRoll-over protection and a seatbelt wornAnswer
- CA mirror and a reversing alarm
- DA second person walking alongside
The frame keeps a space around the driver and the belt keeps the driver inside that space. One without the other does very little. Drivers are also trained and authorised for the particular machine they are on.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/dumpers.htm
- 75. Safetycscs-78
How should a dumper skip be loaded?
- AHeaped as high as it will hold
- BEvenly, and not above the skip edgeAnswer
- CWith the weight over the back axle
- DWith the heaviest material on top
An overfilled or lopsided skip makes the machine unstable and spills material as it moves. It also blocks the driver's view forward, and a driver who cannot see is the second big cause of deaths. Keep the load level and inside the skip.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/dumpers.htm
- 76. Safetycscs-79
A telehandler driver wants to carry a pallet across site with the boom raised. What is the rule?
- AAllowed at walking pace
- BAllowed if a signaller walks ahead
- CTravelling with a raised load should be avoidedAnswer
- DAllowed on level ground only
Lifting the load lifts the centre of gravity, and the machine then tips easily on a slope or a rut. Lower the load and travel, then lift where the work is. Overturning while lifting is one of the two ways these machines kill.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/telescopic.htm
- 77. Safetycscs-80
What should a site do about the speed of plant moving around it?
- ALeave it to each driver's judgement
- BSet a site speed limitAnswer
- CAllow full speed on haul roads
- DLimit speed only near the offices
A stated limit gives everyone the same rule and something to enforce. Taking corners too fast is a common way to overturn a machine. It also gives people on foot time to get clear.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/telescopic.htm
- 78. Safetycscs-81
How often should a ladder be checked before use?
- AEvery time, before you climb itAnswer
- BOnce a week by the supervisor
- COnly after it has been repaired
- DAt the start of each month
The check is quick and it belongs to the person about to climb. It catches the split stile and the missing foot before they matter. A ladder that has been dropped needs checking again, even if it was fine an hour ago.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/ladders.htm
- 79. Safetycscs-82
A ladder falls off the back of a van on the way to site. What should happen next?
- AUse it, since it landed on grass
- BCheck it again before it is usedAnswer
- CSend it straight for scrap
- DUse it only for short climbs
A drop can bend a stile or damage the feet in a way that is easy to miss at a glance. Anything that changes the ladder means another check, including moving it from dirty ground to clean. The point is to find the defect before it causes the fall.
Sourcehttps://www.hse.gov.uk/construction/safetytopics/ladders.htm
- 80. Safetycscs-83
Are ladders banned from construction work?
- AYes, since the work at height rules came in
- BYes, unless a manager signs a permit
- CNo, they suit low risk short jobsAnswer
- DNo, and they are the first choice for any job
The law asks for a sensible and proportionate approach, and for a short low risk task a ladder can be the right tool. It should not be the automatic first choice though. Pick the right type, and know how to use it safely.
Sourcehttps://www.hse.gov.uk/work-at-height/ladders/index.htm